WELL · 42-501-31794 · DISTRICT 8

Webb Melba #120

N

Yoakum County · Brahaney (Wolfcamp) field  · Vertical

Webb Melba #120 (API 42-501-31794) is a well in Yoakum County operated by Getty Oil CO., completed July 1, 1981.

The RRC has issued 2 drilling permits between 1980 and 1984, permitted to 11,650 ft.

Completion filings report 3 formation tops, including Yates, Queen, San Andres.

Its lease has reported 9.93M barrels of oil and 5.59M mcf of gas since January 1993, last reporting in July 2026. The lease carries 213 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 120K barrels injected in the 12 months reported through November 2025.

Operator of record

Getty Oil Co.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 27, 1989
Permits on file
1,564
Phone
(432) 688-4100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGetty Oil Co.
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitGetty Oil Co.Oct 25, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,650
total depth, ft
2
permits on file
Oct 25, 1984
last permit issued
Jul 1, 1981
completed
9.93M
cumulative oil, bbl
5.59M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 1, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 213 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brahaney Unit O-11-60135BrahaneyHilcorp Energy Company2139.93M5.59MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 150,042 · prior 12 141,999(+6%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 112,776 · prior 12 111,318(+1%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Central Resources, Inc.Jan 1993 → Jan 1997
  2. 2Collins & Ware, Inc.Feb 1997 → Jun 2000
  3. 3Apache CorporationJul 2000 → Nov 2024
  4. 4Hilcorp Energy CompanyDec 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
255593-99RecompletionGetty Oil Co.Oct 16, 1984Oct 25, 1984—9,003
71610-99DrillGetty Oil Co.Jan 29, 1980Jan 29, 1980Feb 4, 198011,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-60135————

Formation tops

As filed on W-2/G-1. Subsea from 3,712 ft elevation.Download CSV →

FormationMD ftSubsea
Yates3,145567
Queen3,938-226
San Andres4,577-865

Perforations

Perforated and open-hole intervals.

FromToType
5,1785,372Perforated
5,2395,276Perforated
9,1489,156Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37539017.5400 S
8.6255,906111,950 S
2.8759,099——
5.511,7787.8751,750 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 12, 2026Apr 23, 2026—
00Mar 30, 2006Sep 14, 2005—
00Feb 10, 1998Dec 3, 1997—
00Nov 7, 1984Dec 29, 1983—
00Nov 3, 1984——
00Jan 12, 1984Apr 20, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

120K
bbl, last 12 reported months
1.69M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084310H-1 InjectionActive5002,5005,150–5,380

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 119,644 · prior 12 146,388(-18%)

010K20K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50131794, documented in the API reference.