WELL · 42-501-31949 · DISTRICT 8

Sable San Andres Unit #51

N

Yoakum County · Sable (San Andres) field  · Vertical

Sable San Andres Unit #51 (API 42-501-31949) is a well in Yoakum County operated by Whiting Oil And Gas Corporation, completed September 15, 2014.

The RRC has issued one drilling permit, issued February 10, 1981, permitted to 5,550 ft.

It was permitted by Arco Oil & Gas CO. and has since transferred to Whiting Oil And Gas Corporation on the wellbore schedule.

Completion filings report 4 formation tops, including Rustler, Yates, San Andres, Sable San Andres.

Its 2 leases have reported 3.05M barrels of oil and 8.09M mcf of gas since January 1993, last reporting in July 2026. The leases carry 123 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 26.8K barrels injected in the 12 months reported through November 2025.

Operator of record

Whiting Oil and Gas Corporation

Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Sep 4, 2025 · 2,092 permits on file · (432) 934-7212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWhiting Oil and Gas Corporation
Production reportsRiley Permian Operating Co, LLCthrough Apr 2026
Latest permitArco Oil & Gas Co.Feb 10, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,550
total depth, ft
1
permits on file
Feb 10, 1981
last permit issued
Sep 15, 2014
completed
3.05M
cumulative oil, bbl
8.09M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 15, 2014
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 123 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sable San Andres Unit O-11-71104Platang (San Andres)Riley Permian Operating Co, LLC49186K273KJun 2020 – Jul 2026
Sable San Andres Unit O-11-60182Sable (San Andres)Whiting Oil and Gas Corporation742.87M7.82MJan 1993 – Dec 2020

Oil, barrels lease total

Last 12 months 24,099 · prior 12 28,635(-16%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 39,633 · prior 12 49,348(-20%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Whiting Petroleum CorporationJan 1993 → Nov 2003
  2. 2Whiting Oil and Gas CorporationDec 2003 → Dec 2022
  3. 3Riley Permian Operating Co, LLCJan 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
121018-99DrillArco Oil & Gas Co.Feb 10, 1981Feb 10, 1981Feb 26, 19815,550

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-60182————
—— O-11-71104————

Formation tops

As filed on W-2/G-1. Subsea from 3,727 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,3401,387
Yates3,100627
San Andres4,457-730
Sable San Andres5,400-1,673

Perforations

Perforated and open-hole intervals.

FromToType
5,1945,257Perforated
5,1945,275Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62546113.75400 S
75,1578.751,450 S
4.55,302——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 28, 2020Jan 21, 2015—
00Feb 12, 2015Jan 21, 2015—
00Jun 29, 1984May 30, 1984—
00Jan 12, 1984May 30, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

26.8K
bbl, last 12 reported months
1.54M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000050716H-1 InjectionActive3502,2005,194–5,275

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 26,808 · prior 12 35,685(-25%)

02K4K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50131949, documented in the API reference.