TEXAS · WELLS · YOAKUM COUNTY · WILLARD UNIT LEASE · API 42-501-34133 · DISTRICT 7B

Willard Unit #A263

Plugged

Yoakum County · Wasson field  · Vertical

Willard Unit #A263 (API 42-501-34133) is a plugged well in Yoakum County, plugged February 14, 2025, last operated by Oxy USA Wtp LP.

The RRC has issued one drilling permit, issued May 17, 1996, permitted to 5,600 ft.

It was permitted by Arco Permian and has since transferred to Oxy USA Wtp LP on the wellbore schedule.

Completion filings report 2 formation tops, including Yates, San Andres.

Its lease has reported 65.4M barrels of oil and 195M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 876 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA WTP LP

Permitted by Arco Permian; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
2,289
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA WTP LP
Production reportsOXY USA WTP LPthrough Apr 2026
Latest permitArco PermianMay 17, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,600
total depth, ft
1
permits on file
May 17, 1996
last permit issued
Apr 17, 2023
completed
65.4M
cumulative oil, bbl
195M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 17, 2023
Shut in
—
Plugged
Feb 14, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 876 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Willard Unit O-11-19308WassonOXY USA WTP LP87665.4M195MJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 1,636,552 · prior 12 1,529,949(+7%)

050K100K150K202420252026

Gas, mcf lease total

Last 12 months 2,207,843 · prior 12 2,484,649(-11%)

0200K400K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arco Oil & Gas Co.Jan 1993 → May 1994
  2. 2Arco PermianJun 1994 → Dec 2001
  3. 3BP America Production CompanyJan 2002 → Apr 2003
  4. 4OXY USA WTP LPMay 2003 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
448257-99DrillArco PermianMay 17, 1996May 17, 1996Jun 18, 19965,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 17, 2023Willard Unit O-11-19308WassonOXY USA WTP LPPlugged—
—Willard Unit O-11-19308WassonOXY USA WTP LPPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,617 ft elevation.Download CSV →

FormationMD ftSubsea
Yates3,080537
San Andres4,564-947

Perforations

Perforated and open-hole intervals.

FromToType
5,1645,275Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62549312.25350 S
5.55,3507.8751,350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 28, 2023Jun 21, 2023—
00Oct 30, 1996Aug 28, 1996Yes
00Oct 25, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50134133, documented in the API reference.