WELL · 42-501-36339 · DISTRICT 8

Nannie May A #2R

Y

Yoakum County · Nannie May (Wolfcamp) field · Producing  · Vertical

Nannie May A #2R (API 42-501-36339) is a well in Yoakum County operated by Hilcorp Energy Company, completed October 24, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued January 13, 2014, permitted to 9,950 ft.

It was permitted by Pedernales Production, LP and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 10 formation tops, including Red Bed - Santa Rosa, Santa Rosa, Yates, San Andres.

Its lease has reported 96.6K barrels of oil and 101K mcf of gas since May 2014, last reporting in July 2026.

Operator of record

Hilcorp Energy Company

Permitted by Pedernales Production, LP; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitPedernales Production, LPJan 13, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,950
total depth, ft
1
permits on file
Jan 13, 2014
last permit issued
Oct 24, 2014
completed
96.6K
cumulative oil, bbl
101K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 24, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nannie May A O-11-70193Nannie May (Wolfcamp)Hilcorp Energy Company196.6K101KMay 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 5,842 · prior 12 7,195(-19%)

05001K202420252026

Gas, mcf lease total

Last 12 months 8,388 · prior 12 9,845(-15%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pedernales Production, LPJun 2014 → Jun 2014
  2. 2Apache CorporationOct 2014 → Nov 2024
  3. 3Hilcorp Energy CompanyDec 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
777102-99DrillPedernales Production, LPJan 10, 2014Jan 13, 2014Jan 14, 20149,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-70193————

Formation tops

As filed on W-2/G-1. Subsea from 3,756 ft elevation.Download CSV →

FormationMD ftSubsea
Red Bed - Santa Rosa3003,456
Santa RosaRED BED-SANTA ROSA3003,456
Yates3,150606
San Andres4,558-802
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO4,558-802
Clear ForkCLEARFORK6,567-2,811
Clear ForkCLEARFORK - ACTIVE CO2 FLOOD6,567-2,811
Devonian——
DevonianDEVONIAN-SILURIAN——
Glorieta——
Leonard——
Mississippian——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
8,9789,355Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,31717.51,550 S
9.6255,49012.252,015 S
5.59,9488.75950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 11, 2014Nov 4, 2014Yes
00Sep 8, 2014Aug 6, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.