WELL · 42-501-36650 · DISTRICT 8

Rusty Crane 604 #1W

Y

Yoakum County · Platang South (Devonian) field · Injection  · Vertical

Rusty Crane 604 #1W (API 42-501-36650) is a well in Yoakum County operated by Riley Permian Operating CO LLC, completed September 16, 2021 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued December 1, 2015, permitted to 12,500 ft.

It was permitted by Riley Exploration Opg CO, LLC and has since transferred to Riley Permian Operating CO LLC on the wellbore schedule.

Completion filings report 11 formation tops, including Santa Rosa, Yates, San Andres, Glorieta.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 5.99M barrels injected in the 12 months reported through November 2025.

Operator of record

Riley Permian Operating Co LLC

Permitted by Riley Exploration Opg Co, LLC; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Feb 4, 2026 · 294 permits on file · (713) 412-5490

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRiley Permian Operating Co LLC
Production reportsnone
Latest permitRiley Exploration Opg Co, LLCDec 1, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
1
permits on file
Dec 1, 2015
last permit issued
Sep 16, 2021
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 16, 2021
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rusty Crane 604 O-11-70502Platang, South (Devonian)Riley Permian Operating Co, LLC100Jun 2016 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
811991-99DrillRiley Exploration Opg Co, LLCNov 16, 2015Dec 1, 2015Jun 4, 201612,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-70502————

Formation tops

As filed on W-2/G-1. Subsea from 3,662 ft elevation.Download CSV →

FormationMD ftSubsea
Santa RosaRED BED-SANTA ROSA2,2441,418
Yates3,030632
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO4,520-858
Glorieta6,081-2,419
Clear ForkCLEARFORK - ACTIVE CO2 FLOOD6,605-2,943
Wolfcamp8,790-5,128
Pennsylvanian10,432-6,770
Mississippian10,611-6,949
Leonard——
Strawn——
Wichita-AlbanyWICHITA——

Perforations

Perforated and open-hole intervals.

FromToType
11,30212,096Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37540517.5395 S
9.6256,02512.251,085 S
711,0428.75475 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 25, 2022Dec 23, 2021—
00Nov 15, 2021Oct 26, 2021—
00Dec 27, 2016Sep 30, 2016—
00Oct 3, 2016——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.99M
bbl, last 12 reported months
37.2M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000113192H-1 InjectionActive30,0002,8756,500–12,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 5,994,751 · prior 12 5,558,401(+8%)

0500K1M20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50136650, documented in the API reference.