WELL · 42-503-00422 · DISTRICT 9

Cullers -A- #B 1

Plugged

Young County · Young County Regular field  · Vertical

Cullers -A- #B 1 (API 42-503-00422) is a plugged well in Young County, plugged January 2, 2009, last operated by Ktc Oil Enterprises LLC.

The RRC has issued one drilling permit, issued May 30, 1990, permitted to 3,000 ft.

It was permitted by Birge Oil CO. and has since transferred to Ktc Oil Enterprises LLC on the wellbore schedule.

Completion filings report one formation top, including Canyon.

Its lease has reported 33.8K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 59 wells, so these are lease totals, not this well alone.

Operator of record

KTC Oil Enterprises LLC

Permitted by Birge Oil Co.; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Oct 4, 2025 · 13 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKTC Oil Enterprises LLC
Production reportsKTC Oil Enterprises, LLCthrough Feb 2005
Latest permitBirge Oil Co.May 30, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
1
permits on file
May 30, 1990
last permit issued
Dec 19, 1994
completed
33.8K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 19, 1994
Shut in
—
Plugged
Jan 2, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 59 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cullers -A- O-13-7690Young County RegularKTC Oil Enterprises, LLC5933.8K21Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Birge Oil Co.Jan 1993 → Apr 1994
  2. 2Joint Resources CompanyMay 1994 → Dec 2003
  3. 3KTC Oil Enterprises, LLCJan 2004 → Feb 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
372369-99ReenterBirge Oil Co.Apr 19, 1990May 30, 1990May 7, 19903,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-7690————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
CanyonLOWER CANYON1,100

Perforations

Perforated and open-hole intervals.

FromToType
575586Perforated
1,1301,140Perforated
3,1803,197Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.757912.2540 S
10.7510012.540 S
10.75100—40 S
4.53,0009840 S
4.53,2457.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1995Dec 29, 1994—
00Jan 16, 1991Sep 24, 1990—
00Nov 28, 1990——
00Jan 12, 1984Dec 5, 1974—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
1.07M
bbl, all reported
Oct 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000073265W-14 DisposalPlugged Feb 9, 20097505001,130–1,140
000037064UIC PermitPlugged Nov 1, 1983003,065–0

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 262,857(-100%)

010K20K30K19931994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50300422, documented in the API reference.