WELL · 42-503-34348 · DISTRICT 9
Rhoades #1
Young County · Young County Regular field · Vertical
Rhoades #1 (API 42-503-34348) is a plugged well in Young County, plugged August 12, 2002, last operated by Echo Production Inc..
The RRC has issued one drilling permit, issued October 31, 1980, permitted to 4,800 ft.
Completion filings report 2 formation tops, including Strawn, Caddo.
Its lease has reported 26.2K barrels of oil and 3.51K mcf of gas since January 1993, last reporting in November 2002. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Mar 5, 2025
- Permits on file
- 296
- Phone
- (940) 549-3292
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Echo Production Inc. |
| Production reports | Echo Production, Inc.through Jun 2001 |
| Latest permit | Echo Production, Inc.Oct 31, 1980 |
- 4,800
- total depth, ft
- 1
- permits on file
- Oct 31, 1980
- last permit issued
- Oct 12, 1991
- completed
- 26.2K
- cumulative oil, bbl
- 3.51K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 12, 1991
- Shut in
- —
- Plugged
- Aug 12, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rhoades O-13-20697 | Young County Regular | Echo Production, Inc. | 3 | 26.2K | 3.51K | Jan 1993 – Nov 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Echo Production, Inc.Mar 1994 → Jun 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 97794-99 | Drill | Echo Production, Inc. | Oct 31, 1980 | Oct 31, 1980 | Nov 20, 1980 | 4,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-20697 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,108 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,036 | 4,040 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 143 | 12.25 | 100 S |
| 2.375 | 4,009 | — | — |
| 4.5 | 4,170 | 7.875 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 20, 1991 | Nov 5, 1991 | — |
| 00 | Jan 12, 1984 | Jan 15, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-34348 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-34348 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 604K
- bbl, all reported
- Nov 2002
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000075789 | H-1 Injection | Plugged Aug 20, 2002 | 200 | 1,250 | 2,592–4,090 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 41,255(-100%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50334348, documented in the API reference.