TEXAS · WELLS · YOUNG COUNTY · API 42-503-34738 · DISTRICT 09

Stephens, Morris #3

Plugged

Young County  · Vertical

Permitted field
Wildcat · the district's fallback for a zone no field is named for

Stephens, Morris #3 (API 42-503-34738) is a plugged well in Young County, plugged September 20, 1993, last operated by Scandrill CO..

The RRC has issued one drilling permit, issued March 10, 1981, permitted to 4,900 ft.

Operator of record

Scandrill Co.

Based in
Graham, TX
P-5 status
Inactive (I)
P-5 last filed
Feb 11, 1982
Permits on file
402
Phone
(817) 549-0751

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitScandrill Co.Mar 10, 1981
4,900
total depth, ft
1
permits on file
Mar 10, 1981
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 20, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
111735-99DrillScandrill Co.Mar 10, 1981Mar 10, 1981Mar 10, 19814,900

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
123K
bbl, all reported
Oct 1994
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000047938W-14 DisposalPlugged Oct 27, 19938001,3002,634–2,650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 147(-100%)

05010019931994

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50334738, documented in the API reference.