TEXAS · WELLS · YOUNG COUNTY · API 42-503-36330 · DISTRICT 09
Allar 44 #2
Young County · Vertical
Allar 44 #2 (API 42-503-36330) is a plugged well in Young County, plugged September 20, 1985, last operated by Hill, R. M..
The RRC has issued one drilling permit, issued September 22, 1982, permitted to 3,000 ft.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 10, 1993
- Permits on file
- 122
- Phone
- (817) 549-2763
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Hill, R. M.Sep 22, 1982 |
- 3,000
- total depth, ft
- 1
- permits on file
- Sep 22, 1982
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Sep 20, 1985
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 172508-99 | Drill | Hill, R. M. | Sep 22, 1982 | Sep 22, 1982 | Oct 22, 1982 | 3,000 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-36330 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-36330 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 5.2K
- bbl, last 12 reported months
- 20.2K
- bbl, all reported
- Oct 1984
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000047827 | H-1 Injection | Plugged Oct 3, 1985 | 0 | 0 | 0–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 14 REPORTED MONTHS
Last 12 months 5,200
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50336330, documented in the API reference.