TEXAS · WELLS · YOUNG COUNTY · STOVALL, N. D. LEASE · API 42-503-37306 · DISTRICT 7C

Stovall N. D. #5

Y

Young County · Young County Regular field · Producing  · Vertical

Stovall N. D. #5 (API 42-503-37306) is a well in Young County operated by Stovall Operating CO., completed December 9, 1983 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 17, 1983, permitted to 2,986 ft.

It was permitted by Stovall, N. D. & Son and has since transferred to Stovall Operating CO. on the wellbore schedule.

Completion filings report 3 formation tops, including Herron City Sand, Kisinger Sand, Strawn.

Its lease has reported 21.8K barrels of oil and 158K mcf of gas since January 1993, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Stovall Operating Co.

Permitted by Stovall, N. D. & Son; the EWA schedule now lists a different operator.

Based in
Graham, TX
P-5 status
Active (A)
P-5 last filed
Nov 25, 2025
Permits on file
259
Phone
(940) 549-2616

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleStovall Operating Co.
Production reportsStovall Operating Co.through Apr 2026
Latest permitStovall, N. D. & SonAug 17, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,986
total depth, ft
1
permits on file
Aug 17, 1983
last permit issued
Dec 9, 1983
completed
21.8K
cumulative oil, bbl
158K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 9, 1983
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Stovall, N. D. O-13-7207Young County RegularStovall Operating Co.521.8K158KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 672 · prior 12 2,292(-71%)

0200400600202420252026

Oil, barrels lease total

Last 12 months 10 · prior 12 30(-67%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Stovall Operating Co.Jan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
206061-99DrillStovall, N. D. & SonAug 12, 1983Aug 17, 1983—3,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 9, 1983Stovall N. D. O-13-7207Young County RegularStovall Operating Co.Producing2,986

Formation tops

As filed on W-2/G-1. Subsea from 1,014 ft elevation.Download CSV →

FormationMD ftSubsea
Herron City Sand2,440-1,426
Kisinger Sand2,490-1,476
StrawnSTRAWN SAND2,990-1,976

Perforations

Perforated and open-hole intervals.

FromToType
2,6062,614Perforated
2,7452,749Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251261160 S
4.52,8377.875330 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 27, 1984Dec 23, 1983—
00Jan 26, 1984Dec 23, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50337306, documented in the API reference.