WELL · 42-503-38913 · DISTRICT 9
Myers Ruby #1
Young County · Newcastle (Mississippi) field · Vertical
Myers Ruby #1 (API 42-503-38913) is a plugged well in Young County, plugged April 1, 1999, last operated by Western Chief Oil & Gas Company.
The RRC has issued one drilling permit, issued August 27, 1985, permitted to 4,999 ft.
Completion filings report one formation top, including Mississippian.
Operator of record
Western Chief Oil & Gas Company
- Based in
- Graham, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 6, 2007
- Permits on file
- 339
- Phone
- (940) 549-0417
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Western Chief Oil & Gas Company |
| Production reports | none |
| Latest permit | Western Chief Oil & Gas CompanyAug 27, 1985 |
- 4,999
- total depth, ft
- 1
- permits on file
- Aug 27, 1985
- last permit issued
- Oct 4, 1985
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 4, 1985
- Shut in
- —
- Plugged
- Apr 1, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Myers, Ruby O-13-25700 | Newcastle (Mississippi) | Western Chief Oil & Gas Company | 1 | 0 | 0 | Jan 1993 – May 1999 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 283438-99 | Drill | Western Chief Oil & Gas Company | Aug 27, 1985 | Aug 27, 1985 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-25700 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,148 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| MississippianMISSISSIPPI LIME | 4,639 | -3,491 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,641 | 4,658 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 222 | 12.25 | 155 S |
| 4.5 | 4,641 | 7.875 | 75 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 18, 1985 | Oct 24, 1985 | Yes |
| 00 | Nov 2, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-38913 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-38913 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50338913, documented in the API reference.