WELL · 42-503-39431 · DISTRICT 9
Slater #7
Young County · James E. (Strawn) field · Vertical
Slater #7 (API 42-503-39431) is a plugged well in Young County, plugged May 20, 2025, last operated by Wes-Mor Drilling Inc..
The RRC has issued one drilling permit, issued February 5, 1987, permitted to 4,999 ft.
Completion filings report 2 formation tops, including Strawn, Caddo.
Its lease has reported 65K barrels of oil and 40.2K mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 20, 2025
- Permits on file
- 304
- Phone
- (940) 549-3383
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wes-Mor Drilling Inc. |
| Production reports | Wes-Mor Drilling, Inc.through Apr 2026 |
| Latest permit | Wes-Mor Drilling, Inc.Feb 5, 1987 |
- 4,999
- total depth, ft
- 1
- permits on file
- Feb 5, 1987
- last permit issued
- May 6, 1987
- completed
- 65K
- cumulative oil, bbl
- 40.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 6, 1987
- Shut in
- —
- Plugged
- May 20, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Slater O-13-22479 | James, E. (Strawn) | Wes-Mor Drilling, Inc. | 6 | 65K | 40.2K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 573 · prior 12 391(+47%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wes-Mor Drilling, Inc.Jan 1993 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 326137-99 | Drill | Wes-Mor Drilling, Inc. | Feb 4, 1987 | Feb 5, 1987 | — | 4,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-22479 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,194 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,724 | 2,840 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 429 | 12.25 | 225 S |
| 4.5 | 4,150 | 7.875 | 185 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 28, 1988 | Mar 15, 1988 | — |
| 00 | Mar 23, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-39431 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-39431 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 655K
- bbl, all reported
- Nov 2024
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000065915 | H-1 Injection | Plugged Jun 24, 2025 | 100 | 500 | 2,724–2,840 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50339431, documented in the API reference.