WELL · 42-503-40157 · DISTRICT 9
Jeffrey-Brown #2
Young County · Young County Regular field · Vertical
Jeffrey-Brown #2 (API 42-503-40157) is a plugged well in Young County, plugged October 23, 2001, last operated by Wes-Mor Drilling Inc..
The RRC has issued one drilling permit, issued May 18, 1990, permitted to 4,900 ft.
Completion filings report 2 formation tops, including Caddo, Marble Falls.
Its lease has reported 920 barrels of oil and 135 mcf of gas since January 1993, last reporting in November 2001. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Graham, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 20, 2025
- Permits on file
- 304
- Phone
- (940) 549-3383
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wes-Mor Drilling Inc. |
| Production reports | Wes-Mor Drilling, Inc.through Feb 1994 |
| Latest permit | Wes-Mor Drilling, Inc.May 18, 1990 |
- 4,900
- total depth, ft
- 1
- permits on file
- May 18, 1990
- last permit issued
- Oct 15, 1990
- completed
- 920
- cumulative oil, bbl
- 135
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 15, 1990
- Shut in
- —
- Plugged
- Oct 23, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jeffrey-Brown O-13-27594 | Young County Regular | Wes-Mor Drilling, Inc. | 2 | 920 | 135 | Jan 1993 – Nov 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wes-Mor Drilling, Inc.Jan 1993 → Feb 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 373460-99 | Drill | Wes-Mor Drilling, Inc. | May 16, 1990 | May 18, 1990 | Aug 3, 1990 | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-27594 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,144 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CaddoCADDO LIME | 3,790 | -2,646 |
| Marble FallsMARBLE FALLS LIME | 4,327 | -3,183 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,148 | 1,158 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 341 | 12.25 | 210 S |
| 4.5 | 1,288 | 7.875 | 310 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 8, 1991 | Feb 13, 1991 | — |
| 00 | Feb 26, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-40157 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-40157 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 65K
- bbl, all reported
- Nov 2001
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000074032 | W-14 Disposal | Plugged Oct 31, 2001 | 100 | 500 | 1,148–1,158 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50340157, documented in the API reference.