TEXAS · WELLS · YOUNG COUNTY · IMU LEASE · API 42-503-41018 · DISTRICT 7C

Imu #4604P

Shut in

Young County · I.M.U. (Caddo Cons.) field · Injection  · Vertical

Imu #4604P (API 42-503-41018) is a well in Young County operated by Ridge Oil Company, completed February 25, 2026 and listed as injection on the RRC schedule, shut in May 1, 2024.

The RRC has issued one drilling permit, issued June 28, 2000, permitted to 4,000 ft.

Completion filings report 4 formation tops, including B/U Smithwick, Smithwick, B/L Smithwick, Caddo.

Its lease has reported 4.16M barrels of oil since November 1999, last reporting volume in April 2026. The lease carries 168 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Ridge Oil Company

Based in
Breckenridge, TX
P-5 status
Active (A)
P-5 last filed
Oct 14, 2025
Permits on file
477
Phone
(254) 559-2297

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRidge Oil Company
Production reportsRidge Oil Companythrough Apr 2026
Latest permitRidge Oil CompanyJun 28, 2000
4,000
total depth, ft
1
permits on file
Jun 28, 2000
last permit issued
Feb 25, 2026
completed
4.16M
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 25, 2026
Shut in
May 1, 2024
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 168 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Imu O-13-29703I.M.U. (Caddo Cons.)Ridge Oil Company1684.16M0Nov 1999 – Apr 2026

Oil, barrels lease total

Last 12 months 84,708 · prior 12 91,023(-7%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ridge Oil CompanyNov 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
496617-99DrillRidge Oil CompanyJun 28, 2000Jun 28, 2000Jul 14, 20004,999

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 25, 2026Imu O-13-29703I.M.U. (Caddo Cons.)Ridge Oil CompanyInjection · shut in May 1, 20244,000
Oct 27, 2000Imu O-13-29703I.M.U. (Caddo Cons.)Ridge Oil CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 1,139 ft elevation.Download CSV →

FormationMD ftSubsea
B/U Smithwick3,752-2,613
SmithwickUPPER SMITHWICK3,752-2,613
B/L Smithwick3,856-2,717
SmithwickLOWER SMITHWICK3,856-2,717
CaddoCADDO LIME3,871-2,732

Perforations

Perforated and open-hole intervals.

FromToType
3,8743,910Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62543912.125235 S
8.62543912.25235 S
5.53,9997.875525 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 26, 2026Mar 10, 2026Yes
00Feb 13, 2001Dec 28, 2000Yes
00Jan 5, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000127418H-1 InjectionActive1,5001,9353,871–3,970

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50341018, documented in the API reference.