TEXAS · WELLS · YOUNG COUNTY · IMU LEASE · API 42-503-41051 · DISTRICT 7C

Imu #447AP

Y

Young County · I.M.U. (Caddo Cons.) field · Producing  · Vertical

Imu #447AP (API 42-503-41051) is a well in Young County operated by Ridge Oil Company, completed November 7, 2000 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 26, 2000, permitted to 4,000 ft.

Completion filings report 3 formation tops, including B/U Smithwick, B/L Smithwick, Caddo.

Its lease has reported 4.16M barrels of oil since November 1999, last reporting volume in April 2026. The lease carries 168 wells, so these are lease totals, not this well alone.

Operator of record

Ridge Oil Company

Based in
Breckenridge, TX
P-5 status
Active (A)
P-5 last filed
Oct 14, 2025
Permits on file
477
Phone
(254) 559-2297

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRidge Oil Company
Production reportsRidge Oil Companythrough Apr 2026
Latest permitRidge Oil CompanySep 26, 2000
4,000
total depth, ft
1
permits on file
Sep 26, 2000
last permit issued
Nov 7, 2000
completed
4.16M
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 7, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 168 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Imu O-13-29703I.M.U. (Caddo Cons.)Ridge Oil Company1684.16M0Nov 1999 – Apr 2026

Oil, barrels lease total

Last 12 months 84,708 · prior 12 91,023(-7%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Ridge Oil CompanyNov 1999 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
500064-99DrillRidge Oil CompanySep 26, 2000Sep 26, 2000Sep 28, 20004,999

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 7, 2000Imu O-13-29703I.M.U. (Caddo Cons.)Ridge Oil CompanyProducing4,000

Formation tops

As filed on W-2/G-1. Subsea from 1,158 ft elevation.Download CSV →

FormationMD ftSubsea
B/U Smithwick3,650-2,492
B/L Smithwick3,829-2,671
CaddoCADDO LIME3,853-2,695

Perforations

Perforated and open-hole intervals.

FromToType
3,8563,862Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62541312.25235 S
5.53,9997.875625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 13, 2001Dec 28, 2000Yes
00Jan 5, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000090804H-1 InjectionNot activated1,5001,9003,856–3,862

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50341051, documented in the API reference.