WELL · 42-503-42452 · DISTRICT 9
Graham-Harrison 780 #17
Young County · Young County Regular field · Producing · Vertical
Graham-Harrison 780 #17 (API 42-503-42452) is a well in Young County operated by S.B. Street Operating Inc., completed May 14, 2020 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued February 21, 2020, permitted to 2,100 ft.
Completion filings report 10 formation tops, including Palo Pinto, Bryson, Strawn, Atoka.
Its lease has reported 32K barrels of oil and 7.02K mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.
Operator of record
Graham, TX · P-5 Y, filed Dec 4, 2025 · 274 permits on file · (325) 226-1585
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | S.B. Street Operating Inc. |
| Production reports | S.B. Street Operating, Inc.through Apr 2026 |
| Latest permit | S.B. Street Operating, Inc.Feb 21, 2020 |
- 2,100
- total depth, ft
- 1
- permits on file
- Feb 21, 2020
- last permit issued
- May 14, 2020
- completed
- 32K
- cumulative oil, bbl
- 7.02K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 14, 2020
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
32.995748, -98.719740
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Young County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Graham-Harrison 780 O-13-19397 | Young County Regular | S.B. Street Operating, Inc. | 7 | 32K | 7.02K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 2,318 · prior 12 2,450(-5%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fultz Oil CompanyJan 1993 → Aug 1993
- 2Akers, B. F.Apr 1996 → Jul 2014
- 3S.B. Street Operating, Inc.Sep 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 862067-99 | Drill | S.B. Street Operating, Inc. | Feb 19, 2020 | Feb 21, 2020 | Feb 28, 2020 | 2,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-19397 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,085 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,972 | 1,980 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 206 | 12.25 | 165 S |
| 4.5 | 2,140 | 7.875 | 165 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 21, 2020 | Jun 17, 2020 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-503-42452 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-503-42452 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Graham-Harrison 78042-503-42509
0.5 KM · S.B. Street Operating, Inc. · Section with this well →
| Palo Pinto | 1,072 | -38 |
| Strawn | 1,515 | -481 |
| Bryson | — | |
| Atoka | — | |
| Herron City | — | |
| Gunsight | — | |
| Cisco | — | |
| Canyon | — |
10 TOPS · FIRST 8
Graham-Harrison 78042-503-03782
0.6 KM · S.B. Street Operating, Inc. · Section with this well →
| Strawn | 1,909 | -835 |
| Atoka | 3,872 | -2,798 |
| Marble Falls | 4,047 | -2,973 |
| Mississippian | 4,300 | -3,226 |
Graham-Harrison 78042-503-42451
0.7 KM · S.B. Street Operating, Inc. · Section with this well →
| Palo Pinto | 1,080 | -42 |
| Bryson | 1,607 | -569 |
| Strawn | 1,834 | -796 |
| Atoka | — | |
| Buttram | — | |
| Caddo | — | |
| Canyon | — | |
| Cisco | — |
10 TOPS · FIRST 8
Harrison, Graham42-503-42478
0.7 KM · Stovall Operating Co. · Section with this well →
| Palo Pinto | 1,504 | -466 |
| Strawn | 1,850 | -812 |
| Herron City | — | |
| Atoka | — | |
| Bryson | — | |
| Buttram | — | |
| Caddo | — | |
| Canyon | — |
10 TOPS · FIRST 8
Graham-Harrison42-503-42453
0.9 KM · Stovall Operating Co. · Section with this well →
| Palo Pinto | 1,504 | -467 |
| Strawn | 1,886 | -849 |
| Gunsight | — | |
| Herron City | — | |
| Buttram | — | |
| Caddo | — | |
| Canyon | — | |
| Cisco | — |
10 TOPS · FIRST 8
Graham-Harrison 78042-503-30262
0.9 KM · S.B. Street Operating, Inc. · Section with this well →
| Palo Pinto | 1,160 | -82 |
| Capps | 1,678 | -600 |
| Caddo | 3,320 | -2,242 |
| Mississippian | 4,292 | -3,214 |
Graham-Harrison42-503-42441
0.9 KM · Stovall Operating Co. · Section with this well →
| Palo Pinto | 1,510 | -473 |
| Caddo | 1,905 | -868 |
| Herron City | — | |
| Gunsight | — | |
| Cisco | — | |
| Canyon | — | |
| Buttram | — | |
| Bryson | — |
10 TOPS · FIRST 8
Graham-Harrison42-503-42563
0.9 KM · Stovall Operating Co. · Section with this well →
| Palo Pinto | 1,528 | -490 |
| Strawn | 1,920 | -882 |
| Buttram | — | |
| Caddo | — | |
| Canyon | — | |
| Cisco | — | |
| Gunsight | — | |
| Herron City | — |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50342452, documented in the API reference.