TEXAS · WELLS · ZAPATA COUNTY · GARCIA, SALVADOR "D" LEASE · API 42-505-31582 · DISTRICT 04

Garcia Salvador D #1

Shut in

Zapata County · Roleta (Wilcox Consolidated) field · Temp Abandoned  · Vertical

Garcia Salvador D #1 (API 42-505-31582) is a well in Zapata County operated by Hilcorp Energy Company, completed February 18, 1988 and listed as temp abandoned on the RRC schedule, shut in June 1, 2017.

The RRC has issued one drilling permit, issued October 26, 1982, permitted to 8,270 ft.

It was permitted by Hng Oil Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its lease has reported 7.56K barrels of oil and 1.36M mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Hilcorp Energy Company

Permitted by HNG Oil Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Jul 2024
Latest permitHNG Oil CompanyOct 26, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,270
total depth, ft
1
permits on file
Oct 26, 1982
last permit issued
Feb 18, 1988
completed
7.56K
cumulative oil, bbl
1.36M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2024

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 18, 1988
Shut in
Jun 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garcia, Salvador "D" G-4-105506Roleta (Wilcox Consolidated)Hilcorp Energy Company17.56K1.36MJan 1993 – Jul 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1993 → Mar 1995
  2. 2Conoco Inc.Apr 1995 → Dec 2002
  3. 3Conocophillips CompanyJan 2003 → Dec 2015
  4. 4Hilcorp Energy CompanyJan 2016 → Dec 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
175571-99DrillHNG Oil CompanyOct 26, 1982Oct 26, 1982—9,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 18, 1988Garcia Salvador D G-4-105506Roleta (Wilcox Consolidated)Hilcorp Energy CompanyTemp Abandoned · shut in Jun 1, 20178,270

Perforations

Perforated and open-hole intervals.

FromToType
8,0978,136Perforated
8,0988,136Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02412.25570 S
76,9888.75565 S
2.3758,013——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 21, 1988Mar 4, 1988—
00Jan 12, 1984May 31, 1983Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50531582, documented in the API reference.