WELL · 42-505-31589 · DISTRICT 4

Slator Ranch #4

Plugged

Zapata County · Pok - a - Dot (8600) field  · Vertical

Slator Ranch #4 (API 42-505-31589) is a plugged well in Zapata County, plugged July 8, 2011, last operated by Wagner Oil Company.

The RRC has issued 3 drilling permits between 1982 and 2000, permitted to 12,200 ft.

Completion filings report 6 formation tops, including Queen City, Wilcox, Lobo Unconformity, Lobo 1.

Operator of record

Wagner Oil Company

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 23, 2025
Permits on file
278
Phone
(817) 335-2222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsWagner Oil Companythrough Apr 2009
Latest permitWagner Oil CompanyFeb 9, 2000
12,200
total depth, ft
3
permits on file
Feb 9, 2000
last permit issued
Feb 14, 2000
completed
0
cumulative oil, bbl
161K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 14, 2000
Shut in
—
Plugged
Jul 8, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slator Ranch G-4-146225Las Ovejas (Lobo 1)Wagner Oil Company1070.3KMay 1993 – Jul 2011
Slator Ranch G-4-177032Pok - a - Dot (8600)Wagner Oil Company1078.8KFeb 2000 – Jul 2011
Slator Ranch G-4-103704Las Ovejas (Lobo 3 FB-D)Wagner Oil Company1011.7KJan 1993 – Nov 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → May 1995
  2. 2Wagner, Duer & Co.Jun 1995 → Dec 1998
  3. 3Wagner Oil CompanyJan 1999 → Apr 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
491613-99RecompletionWagner Oil CompanyFeb 1, 2000Feb 9, 2000Feb 13, 200010,480
407408-99RecompletionFina Oil & Chemical CompanyDec 18, 1992Jun 29, 1993Dec 14, 199211,236
176254-99DrillTenneco Oil Co.Mar 13, 1985Nov 2, 1982—12,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 14, 2000Slator Ranch G-4-177032Pok - a - Dot (8600)Wagner Oil CompanyPlugged—
May 13, 1993Slator Ranch G-4-146225Las Ovejas (Lobo 1)Wagner Oil CompanyPlugged—
Jan 8, 1983Slator Ranch G-4-103704Las Ovejas (Lobo 3 FB-D)Wagner Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 573 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City3,172-2,599
Wilcox5,839-5,266
Lobo Unconformity10,360-9,787
Lobo 110,398-9,825
Lobo 310,610-10,037
MidwayMIDWAY (WILLS PT.)11,090-10,517

Perforations

Perforated and open-hole intervals.

FromToType
9,2509,260Perforated
9,2819,290Perforated
10,39710,524Perforated
10,61410,758Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,50514.75990 S
2.57,744——
7.6257,9879.75400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 28, 2000May 18, 2000Yes
00Jun 5, 2000——
00Sep 24, 1993Jun 21, 1993Yes
00Aug 31, 1993——
00Mar 21, 1985Feb 22, 1985—
00Jan 12, 1984Feb 17, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50531589, documented in the API reference.