WELL · 42-505-31806 · DISTRICT 4

Gutierrez Heirs #1

N

Zapata County · Urebeno South (Lobo 6) field  · Vertical

Gutierrez Heirs #1 (API 42-505-31806) is a well in Zapata County operated by Hng Oil Company, completed June 26, 1984.

The RRC has issued 3 drilling permits between 1984 and 1987, permitted to 11,000 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Hng Oil Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Midway.

No lease production has been reported under this well’s leases.

Operator of record

HNG Oil Company

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 25, 1986
Permits on file
1,121
Phone
(432) 686-3714

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHNG Oil Company
Production reportsVaras Energy Operating Company,through Apr 2026
Latest permitEnron Oil & Gas CompanySep 16, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
3
permits on file
Sep 16, 1987
last permit issued
Jun 26, 1984
completed
0
cumulative oil, bbl
6.63M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 26, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gutierrez Heirs G-4-113810Urebeno, South (Wilcox 7000)Varas Energy Operating Company,106.63MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 1,918 · prior 12 1,784(+8%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1993 → Sep 1999
  2. 2EOG Resources, Inc.Oct 1999 → Jun 2013
  3. 3Bluestone Natural Res. II, LLCSep 2013 → Dec 2019
  4. 4Blackbeard Operating, LLCJan 2020 → Nov 2020
  5. 5Hugoton Operating Company, Inc.Dec 2020 → Dec 2024
  6. 6Varas Energy Operating Company,Jan 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
335903-99RecompletionEnron Oil & Gas CompanySep 14, 1987Sep 16, 1987—9,800
257448-99RecompletionHNG Oil CompanyNov 7, 1984Nov 8, 1984—9,814
237287-99DrillHNG Oil CompanyApr 30, 1984May 1, 1984May 10, 198411,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-113810————

Formation tops

As filed on W-2/G-1. Subsea from 380 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox3,350-2,970
WilcoxWILCOX TD3,350-2,970
Midway9,710-9,330

Perforations

Perforated and open-hole intervals.

FromToType
6,8426,856Perforated
6,9076,925Perforated
6,9326,975Perforated
6,9606,982Perforated
6,9847,004Perforated
7,0337,095Perforated
7,0347,095Perforated
8,4458,449Perforated
8,7478,808Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,00012.251,080 S
76,4958.75655 S
4.59,7956.25430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 2, 2001Aug 22, 2001—
00Oct 1, 2001Aug 22, 2001—
00Jan 13, 1988Dec 2, 1987Yes
00Dec 16, 1987Nov 5, 1987Yes
00Dec 18, 1984Nov 29, 1984—
00Dec 7, 1984Nov 26, 1984—
00Nov 2, 1984Oct 9, 1984—
00Oct 16, 1984Sep 27, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50531806, documented in the API reference.