TEXAS · WELLS · ZAPATA COUNTY · SMITH "AH" LEASE · API 42-505-31901 · DISTRICT 04

Smith AH #1

Y

Zapata County · Roleta (7483) field · Producing  · Vertical

Smith AH #1 (API 42-505-31901) is a well in Zapata County operated by Merit Energy Company, completed December 12, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 23, 1984, permitted to 7,800 ft.

It was permitted by Txo Production Corp. and has since transferred to Merit Energy Company on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

No lease production has been reported under this well’s leases.

Operator of record

Merit Energy Company

Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Nov 7, 2025
Permits on file
1,049
Phone
(972) 701-8377

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMerit Energy Company
Production reportsMerit Energy Companythrough Apr 2026
Latest permitTXO Production Corp.Aug 23, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,800
total depth, ft
1
permits on file
Aug 23, 1984
last permit issued
Dec 12, 1984
completed
0
cumulative oil, bbl
567K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 12, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith "AH" G-4-114029Roleta (7483)Merit Energy Company10567KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 7,096 · prior 12 6,586(+8%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Production Co., Inc.Jan 1993 → Jun 1993
  2. 2Bridge Oil Company, L. P.Jul 1993 → Sep 1994
  3. 3Parker & Parsley Development L.POct 1994 → Jan 1995
  4. 4Parker & Parsley Producing L.P.Feb 1995 → Oct 1997
  5. 5Pioneer Resources Producing, L.PNov 1997 → Jun 1999
  6. 6Prize Operating CompanyOct 1999 → Mar 2002
  7. 7Gruy Petroleum Management Co.Apr 2002 → Nov 2002
  8. 8Peoples Energy Prod.-TX, L.P.Dec 2002 → Sep 2007
  9. 9Coronado Energy E&P Company, LLCOct 2007 → Dec 2010
  10. 10El Paso E & P Company, L. P.Jan 2011 → Jul 2012
  11. 11EP Energy E&P Company, L.P.Aug 2012 → Oct 2013
  12. 12Cantera Operating, LLCNov 2013 → Nov 2017
  13. 13Merit Energy CompanyDec 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
249210-99DrillTXO Production Corp.Aug 21, 1984Aug 23, 1984Sep 14, 19848,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 12, 1984Smith AH G-4-114029Roleta (7483)Merit Energy CompanyProducing7,800

Formation tops

As filed on W-2/G-1. Subsea from 359 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox5,150-4,791

Perforations

Perforated and open-hole intervals.

FromToType
7,4227,432Perforated
7,4387,453Perforated
7,4627,466Perforated
7,4947,515Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,01812.25310 S
76,7988.75500 S
4.57,7986125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 7, 1985Dec 19, 1984—
00Jan 1, 1985Dec 14, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50531901, documented in the API reference.