TEXAS · WELLS · ZAPATA COUNTY · VELA "B" LEASE · API 42-505-32045 · DISTRICT 04

Vela B #2

Plugged

Zapata County · Roleta (7483) field  · Vertical

Vela B #2 (API 42-505-32045) is a plugged well in Zapata County, plugged July 10, 2012, last operated by EP Energy E&P Company L.P..

The RRC has issued one drilling permit, issued March 28, 1985, permitted to 8,300 ft.

It was permitted by Txo Production Corp. and has since transferred to EP Energy E&P Company L.P. on the wellbore schedule.

Completion filings report 4 formation tops, including Queen City, Top Of Lo. Queen City, Wilcox, Top Of 7483 Sand.

Its lease has reported 2.77K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

EP Energy E&P Company L.P.

Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 30, 2024
Permits on file
1,518
Phone
(713) 997-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEP Energy E&P Company L.P.
Production reportsEl Paso E & P Company, L. P.through Mar 1993
Latest permitTXO Production Corp.Mar 28, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,300
total depth, ft
1
permits on file
Mar 28, 1985
last permit issued
Jun 11, 1985
completed
0
cumulative oil, bbl
2.77K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1993

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 11, 1985
Shut in
—
Plugged
Jul 10, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vela "B" G-4-116930Roleta (7483)El Paso E & P Company, L. P.102.77KJan 1993 – Mar 1993

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridge Oil Production Co., Inc.Jan 1993 → Mar 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
270776-99DrillTXO Production Corp.Mar 25, 1985Mar 28, 1985Apr 20, 19858,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 11, 1985Vela B G-4-116930Roleta (7483)EP Energy E&P Company L.P.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 325 ft elevation.Download CSV →

FormationMD ftSubsea
Queen CityTOP OF QUEEN CITY2,710-2,385
Top of Lo. Queen City4,425-4,100
WilcoxTOP OF WILCOX5,165-4,840
Top of 7483 Sand7,430-7,105

Perforations

Perforated and open-hole intervals.

FromToType
7,3927,411Perforated
7,4147,419Perforated
7,4217,425Perforated
7,4547,460Perforated
7,4697,477Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62599012.25385 S
77,0358.75415 S
4.57,8006125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 9, 1985Jun 21, 1985—
00Jun 29, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532045, documented in the API reference.