WELL · 42-505-32179 · DISTRICT 4
Zachry E.B. #7
Zapata County · J. C. Martin (Lobo) field · Vertical
Zachry E.B. #7 (API 42-505-32179) is a plugged well in Zapata County, plugged August 11, 1999, last operated by Mobil Producing TX. & N.M. Inc..
The RRC has issued 2 drilling permits (amended once) between 1986 and 1993, permitted to 10,700 ft.
Operator of record
Mobil Producing TX. & N.M. Inc.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2025
- Permits on file
- 6,763
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mobil Producing TX. & N.M. Inc. |
| Production reports | Mobil Producing TX. & N.M. Inc.through May 1996 |
| Latest permit | Mobil Producing TX. & N.M. Inc.Jul 26, 1993 |
- 10,700
- total depth, ft
- 3
- permits on file
- Jul 26, 1993
- last permit issued
- Sep 1, 1993
- completed
- 0
- cumulative oil, bbl
- 36.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 1, 1993
- Shut in
- —
- Plugged
- Aug 11, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Zachry, E.B. G-4-150414 | J. C. Martin (Lobo) | Mobil Producing TX. & N.M. Inc. | 1 | 0 | 33.6K | Sep 1993 – Aug 1999 |
| Zachry, E.B. G-4-122472 | Benavides (Lobo 8900) | Mobil Producing TX. & N.M. Inc. | 1 | 0 | 3.21K | Jan 1993 – Aug 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mobil Producing TX. & N.M. Inc.Jan 1993 → May 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 413866-98 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jul 14, 1994 | Jul 26, 1993 | Aug 16, 1993 | 10,700 |
| 413866-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jul 14, 1993 | Jul 26, 1993 | — | 10,700 |
| 299574-99 | Drill | Mobil Producing TX. & N.M. Inc. | May 21, 1986 | Mar 14, 1986 | Jun 13, 1986 | 10,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-122472 | — | — | — | — |
| — | — G-4-150414 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,686 | 8,712 | Perforated |
| 9,187 | 9,366 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 535 | 17.5 | 555 S |
| 13.375 | 535 | — | 555 S |
| 9.625 | 6,880 | — | 380 S |
| 9.625 | 6,880 | 12.25 | 1,850 S |
| 7 | 10,360 | 8.5 | 460 S |
| 7 | 10,360 | — | 460 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 7, 1994 | May 20, 1994 | Yes |
| 00 | Aug 11, 1994 | — | — |
| 00 | Nov 13, 1986 | Oct 16, 1986 | Yes |
| 00 | Nov 8, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-32179 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-32179 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50532179, documented in the API reference.