TEXAS · WELLS · ZAPATA COUNTY · RAMIREZ, J.S. LEASE · API 42-505-32227 · DISTRICT 04
Ramirez J.S. #2
Zapata County · Roleta (Wilcox Consolidated) field · Vertical
Ramirez J.S. #2 (API 42-505-32227) is a plugged well in Zapata County, plugged February 19, 2004, last operated by Conocophillips Company.
The RRC has issued 2 drilling permits between 1986 and 1987, permitted to 10,600 ft.
It was permitted by Arco Oil & Gas CO. and has since transferred to Conocophillips Company on the wellbore schedule.
Operator of record
Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 3, 2026
- Permits on file
- 3,290
- Phone
- (432) 683-7443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Conocophillips Company |
| Production reports | none |
| Latest permit | Arco Oil & Gas Co.Sep 14, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,600
- total depth, ft
- 2
- permits on file
- Sep 14, 1987
- last permit issued
- Oct 4, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 4, 1986
- Shut in
- —
- Plugged
- Feb 19, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Ramirez, J.S. G-4-123472 | Roleta (Wilcox Consolidated) | Conocophillips Company | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 335050-99 | Recompletion | Arco Oil & Gas Co. | Aug 25, 1987 | Sep 14, 1987 | — | 9,852 |
| 305745-99 | Drill | Arco Oil & Gas Co. | Aug 27, 1986 | Aug 27, 1986 | — | 10,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 4, 1986 | Ramirez J.S. G-4-123472 | Roleta (Wilcox Consolidated) | Conocophillips Company | Plugged | — |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 650 | 12.25 | 300 S |
| 7 | 9,852 | 8.5 | 263 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 7, 1987 | Mar 2, 1987 | — |
| 00 | Mar 13, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-32227 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-32227 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Jan 2012
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000066033 | W-14 Disposal | Plugged Jun 20, 2012 | 300 | 1,000 | 4,100–4,168 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50532227, documented in the API reference.