TEXAS · WELLS · ZAPATA COUNTY · FERNANDO LEASE · API 42-505-32257 · DISTRICT 04

Fernando #4

Plugged

Zapata County · Francisco (Lobo 9500) field  · Vertical

Fernando #4 (API 42-505-32257) is a plugged well in Zapata County, plugged December 21, 1995, last operated by Transtexas Gas Corporation.

The RRC has issued one drilling permit, issued November 4, 1986, permitted to 10,100 ft.

It was permitted by Transamerican Natural Gas Corp. and has since transferred to Transtexas Gas Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including Queen City, Wilcox, Wills Point.

Its lease has reported 11.9K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Transtexas Gas Corporation

Permitted by Transamerican Natural Gas Corp.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 2, 2004
Permits on file
925
Phone
(214) 692-9211

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTranstexas Gas Corporation
Production reportsTranstexas Gas Corporationthrough Oct 1995
Latest permitTransamerican Natural Gas Corp.Nov 4, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,100
total depth, ft
1
permits on file
Nov 4, 1986
last permit issued
Feb 15, 1987
completed
0
cumulative oil, bbl
11.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 15, 1987
Shut in
—
Plugged
Dec 21, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fernando G-4-123647Francisco (Lobo 9500)Transtexas Gas Corporation1011.9KJan 1993 – Oct 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transamerican Natural Gas Corp.Jan 1993 → Jul 1993
  2. 2Transtexas Gas CorporationAug 1993 → Oct 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
322548-99DrillTransamerican Natural Gas Corp.Oct 31, 1986Nov 4, 1986—10,100

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 15, 1987Fernando G-4-123647Francisco (Lobo 9500)Transtexas Gas CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 445 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City1,400-955
Wilcox3,860-3,415
WilcoxLOWER WILCOX6,010-5,565
Wills Point9,075-8,630

Perforations

Perforated and open-hole intervals.

FromToType
8,8788,891Perforated
8,9568,962Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7577014.75530 S
7.6256,6009.875365 S
2.87510,1006.75835 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 15, 1987Mar 16, 1987Yes
00Apr 1, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532257, documented in the API reference.