WELL · 42-505-32415 · DISTRICT 4

LA Perla #80

Shut in

Zapata County · LA Perla (Lobo Cons.) field · Temp Abandoned  · Vertical

La Perla #80 (API 42-505-32415) is a well in Zapata County operated by Hilcorp Energy Company, completed October 23, 1997 and listed as temp abandoned on the RRC schedule, shut in December 1, 2013.

The RRC has issued 2 drilling permits between 1988 and 1997, permitted to 10,363 ft.

It was permitted by Conoco Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Wills Point.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsConocophillips Companythrough Nov 2013
Latest permitConoco Inc.Sep 29, 1997
10,363
total depth, ft
2
permits on file
Sep 29, 1997
last permit issued
Oct 23, 1997
completed
0
cumulative oil, bbl
542K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 23, 1997
Shut in
Dec 1, 2013
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
LA Perla G-4-128152LA Perla Ranch (Lobo 9050)Hilcorp Energy Company10421KJan 1993 – Jul 2026
LA Perla G-4-127447LA Perla (Navarro)Conoco Inc.10120KJan 1993 – Aug 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transamerican Natural Gas Corp.Jan 1993 → Jul 1993
  2. 2Transtexas Gas CorporationAug 1993 → May 1997
  3. 3Conoco Inc.Jun 1997 → Dec 2002
  4. 4Conocophillips CompanyJan 2003 → Nov 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
468124-99RecompletionConoco Inc.Sep 29, 1997Sep 29, 1997—10,363
341888-99DrillTransamerican Natural Gas Corp.Jan 25, 1988Jan 25, 1988—10,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 23, 1997LA Perla G-4-128152LA Perla (Lobo Cons.)Hilcorp Energy CompanyTemp Abandoned · shut in Dec 1, 201310,363
May 13, 1988LA Perla G-4-127447LA Perla (Navarro)Conocophillips CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 399 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX (CARRIZO)4,100-3,701
WilcoxLOWER WILCOX6,250-5,851
Wills Point9,500-9,101

Perforations

Perforated and open-hole intervals.

FromToType
8,6068,641Perforated
9,0439,104Perforated
10,08610,097Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7575014.75530 S
7.6256,6659.875365 S
5.510,0635.5490 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 22, 2003Jul 3, 2003—
00Sep 12, 1988Jun 16, 1988Yes
00Aug 30, 1988——
00Jun 22, 1988May 26, 1988Yes
00Jun 16, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532415, documented in the API reference.