WELL · 42-505-32798 · DISTRICT 4

Gonzales P. Gas Unit #2

Plugged

Zapata County · Roleta (Wilcox Consolidated) field  · Directional

Gonzales P. Gas Unit #2 (API 42-505-32798) is a plugged well in Zapata County, plugged August 18, 2000, last operated by Conoco Inc..

The RRC has issued one drilling permit, issued June 4, 1991, permitted to 12,000 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Conoco Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Queen City, Wilcox.

Operator of record

Conoco Inc.

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 1, 2011
Permits on file
4,644
Phone
(281) 293-5562

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleConoco Inc.
Production reportsConoco Inc.through Jan 2000
Latest permitEnron Oil & Gas CompanyJun 4, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
Jun 4, 1991
last permit issued
Sep 13, 1991
completed
0
cumulative oil, bbl
1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2000

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 13, 1991
Shut in
—
Plugged
Aug 18, 2000

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gonzales, P. Gas Unit G-4-139477Roleta (Wilcox Consolidated)Conoco Inc.101MJan 1993 – Aug 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1993 → Mar 1995
  2. 2Conoco Inc.Apr 1995 → Jan 2000

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
388626-99DrillEnron Oil & Gas CompanyJun 4, 1991Jun 4, 1991Jun 12, 199112,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 13, 1991Gonzales P. Gas Unit G-4-139477Roleta (Wilcox Consolidated)Conoco Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 318 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City2,320-2,002
Wilcox6,390-6,072
WilcoxLOWER WILCOX8,090-7,772

Perforations

Perforated and open-hole intervals.

FromToType
9,4049,441Perforated
9,4489,453Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,97712.25695 S
78,3468.75335 S
2.87510,4926.25400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 2, 1991Oct 15, 1991—
00Nov 27, 1991Oct 4, 1991Yes
00Oct 11, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532798, documented in the API reference.