TEXAS · WELLS · ZAPATA COUNTY · API 42-505-32994 · DISTRICT 04

Lopez Rufino and Josefa #2

Plugged

Zapata County · Berry R. Cox (Wx. 6TH Hinnant) field  · Vertical

Lopez Rufino And Josefa #2 (API 42-505-32994) is a plugged well in Zapata County, plugged October 30, 2018, last operated by Hughes Dan A. Company L.P..

The RRC has issued 2 drilling permits between 1992 and 2011, permitted to 15,500 ft.

Completion filings report 7 formation tops, including Yegua, Queen City, Wilcox, Top Of 6th Hinnant.

Operator of record

Hughes Dan A. Company L.P.

Based in
Beeville, TX
P-5 status
Active (A)
P-5 last filed
Mar 25, 2026
Permits on file
207
Phone
(361) 358-3752

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHughes Dan A. Company L.P.
Production reportsHughes, Dan A. Company, L.P.through Nov 2017
Latest permitHughes, Dan A. Company, L.P.Sep 27, 2011
15,500
total depth, ft
2
permits on file
Sep 27, 2011
last permit issued
Sep 15, 2011
completed
0
cumulative oil, bbl
5.29M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1993 THROUGH Oct 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 15, 2011
Shut in
—
Plugged
Oct 30, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lopez, Rufino & Josefa G-4-145011Dan A. Hughes (7TH Hinnant, SW.)Hughes, Dan A. Company, L.P.105.21MApr 1993 – Oct 2018
Lopez, Rufino and Josefa G-4-265849Berry R. Cox (Wx. 6TH Hinnant)Hughes, Dan A. Company, L.P.1084.1KSep 2011 – Oct 2018

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hughes, Dan A. CompanyApr 1993 → Mar 2006
  2. 2Hughes, Dan A. Company, L.P.Apr 2006 → Nov 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
724620-99RecompletionHughes, Dan A. Company, L.P.Sep 20, 2011Sep 27, 2011Jul 25, 201115,001
407671-99DrillHughes, Dan A. CompanyDec 28, 1992Dec 29, 1992Dec 31, 199215,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 15, 2011Lopez Rufino and Josefa G-4-265849Berry R. Cox (Wx. 6TH Hinnant)Hughes Dan A. Company L.P.Plugged—
Apr 8, 1993Lopez Rufino & Josefa G-4-145011Dan A. Hughes (7TH Hinnant SW.)Hughes Dan A. Company L.P.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 842 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaTOP OF YEGUA2,015-1,173
Yegua2,015-1,173
Queen City5,195-4,353
Queen CityTOP OF QUEEN CITY5,195-4,353
WilcoxTOP OF WILCOX9,200-8,358
Wilcox9,200-8,358
Top of 6TH Hinnant12,800-11,958
7TH Hinnant Sand13,428-12,586
7TH Hinnant Sant13,428-12,586
Top of 7TH Hinnant13,428-12,586

Perforations

Perforated and open-hole intervals.

FromToType
12,83812,856Perforated
12,86312,874Perforated
12,88612,892Perforated
13,53013,630Perforated
13,70013,728Perforated
13,75013,763Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,51717.51,190 S
9.6257,82812.25700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 2013Oct 26, 2011—
00Jul 22, 1993Jul 6, 1993Yes
00May 18, 1993Apr 27, 1993Yes
00May 7, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50532994, documented in the API reference.