TEXAS · WELLS · ZAPATA COUNTY · VIDAURRI, R. ET AL LEASE · API 42-505-33028 · DISTRICT 04

Vidaurri R. et Al #26

Shut in

Zapata County · La Perla (Lobo Cons.) field · Temp Abandoned  · Vertical

Vidaurri R. ET AL #26 (API 42-505-33028) is a well in Zapata County operated by Hilcorp Energy Company, completed May 10, 1993 and listed as temp abandoned on the RRC schedule, shut in April 1, 2025.

The RRC has issued one drilling permit, issued March 26, 1993, permitted to 9,300 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Lobo Unconformity, Willis Point, Cretaceous.

Its lease has reported 2.45K barrels of oil and 932K mcf of gas since May 1993, last reporting volume in March 2025.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Mar 2025
Latest permitChevron U. S. A. Inc.Mar 26, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,300
total depth, ft
1
permits on file
Mar 26, 1993
last permit issued
May 10, 1993
completed
2.45K
cumulative oil, bbl
932K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1993 THROUGH Mar 2025

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 10, 1993
Shut in
Apr 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vidaurri, R. et Al G-4-145747La Perla (Lobo Cons.)Hilcorp Energy Company12.45K932KMay 1993 – Mar 2025

Gas, mcf lease total

Last 12 months 0 · prior 12 43(-100%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.May 1993 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Mar 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
410142-99DrillChevron U. S. A. Inc.Mar 24, 1993Mar 26, 1993Apr 14, 19939,800

Completions

CompletedLeaseFieldOperatorStatusDepth
May 10, 1993Vidaurri R. et Al G-4-145747La Perla (Lobo Cons.)Hilcorp Energy CompanyTemp Abandoned · shut in Apr 1, 20259,300

Formation tops

As filed on W-2/G-1. Subsea from 377 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo Unconformity7,230-6,853
Willis Point7,985-7,608
Cretaceous8,740-8,363

Perforations

Perforated and open-hole intervals.

FromToType
7,5207,530Perforated
7,5467,610Perforated
7,6227,632Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00012.25335 S
76,3698.75300 S
2.8759,2676.125500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 22, 1993May 25, 1993Yes
00Jul 8, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533028, documented in the API reference.