TEXAS · WELLS · ZAPATA COUNTY · CARRILLO, O.P. LEASE · API 42-505-33155 · DISTRICT 04

Carrillo O.P. #2

Shut in

Zapata County · La Perla (Lobo Cons.) field · Temp Abandoned  · Vertical

Carrillo O.P. #2 (API 42-505-33155) is a well in Zapata County operated by Hilcorp Energy Company, completed May 3, 1994 and listed as temp abandoned on the RRC schedule, shut in October 1, 2020.

The RRC has issued one drilling permit, issued January 25, 1994, permitted to 9,696 ft.

It was permitted by Transtexas Gas Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including T/Wilcox, B/Wilcox, Wills Point.

Its lease has reported 357 barrels of oil and 1.28M mcf of gas since May 1994, with no volume in the three years through April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Sep 2020
Latest permitTranstexas Gas CorporationJan 25, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,696
total depth, ft
1
permits on file
Jan 25, 1994
last permit issued
May 3, 1994
completed
357
cumulative oil, bbl
1.28M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Sep 2020

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 3, 1994
Shut in
Oct 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Carrillo, O.P. G-4-151091La Perla (Lobo Cons.)Hilcorp Energy Company13571.28MMay 1994 – Sep 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationMay 1994 → May 1997
  2. 2Conoco Inc.Jun 1997 → Feb 2000
  3. 3Hilcorp Energy CompanyJan 2017 → Sep 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
420536-99DrillTranstexas Gas CorporationJan 25, 1994Jan 25, 1994Feb 11, 19949,700

Completions

CompletedLeaseFieldOperatorStatusDepth
May 3, 1994Carrillo O.P. G-4-151091La Perla (Lobo Cons.)Hilcorp Energy CompanyTemp Abandoned · shut in Oct 1, 20209,696

Formation tops

As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →

FormationMD ftSubsea
T/Wilcox3,900-3,540
B/Wilcox5,900-5,540
Wills Point9,100-8,740

Perforations

Perforated and open-hole intervals.

FromToType
8,2708,824Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62576012.25350 S
77,1998.75265 S
4.59,6946.125350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 12, 1994May 19, 1994Yes
00Oct 3, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533155, documented in the API reference.