WELL · 42-505-33162 · DISTRICT 4

Rancho Nuevo #3

Shut in

Zapata County · Agarito (Navarro) field · Temp Abandoned  · Vertical

Rancho Nuevo #3 (API 42-505-33162) is a well in Zapata County operated by Hilcorp Energy Company, completed August 24, 1994 and listed as temp abandoned on the RRC schedule, shut in February 1, 2023.

The RRC has issued 2 drilling permits in 1994, permitted to 9,600 ft.

It was permitted by Transtexas Gas Corporation and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including T/Wilcox, Wilcox, B/Wilcox, Wills Point.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Jan 2023
Latest permitTranstexas Gas CorporationSep 7, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,600
total depth, ft
2
permits on file
Sep 7, 1994
last permit issued
Aug 24, 1994
completed
0
cumulative oil, bbl
1.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 24, 1994
Shut in
Feb 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rancho Nuevo G-4-150072LA Perla (Lobo Cons.)Hilcorp Energy Company10953KJun 1994 – Jul 2026
Rancho Nuevo G-4-151300Agarito (Navarro)Hilcorp Energy Company10294KAug 1994 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationJun 1994 → May 1997
  2. 2Conoco Inc.Jun 1997 → Dec 2002
  3. 3Conocophillips CompanyJan 2003 → Dec 2015
  4. 4Hilcorp Energy CompanyJan 2016 → Jan 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427813-99OtherTranstexas Gas CorporationSep 7, 1994Sep 7, 1994Aug 16, 19949,800
421418-99DrillTranstexas Gas CorporationFeb 23, 1994Feb 23, 1994Mar 15, 19949,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 24, 1994Rancho Nuevo G-4-151300Agarito (Navarro)Hilcorp Energy CompanyTemp Abandoned · shut in Feb 1, 20239,600
Jun 9, 1994Rancho Nuevo G-4-150072LA Perla (Lobo Cons.)Hilcorp Energy CompanyTemp Abandoned · shut in Oct 1, 20009,600

Formation tops

As filed on W-2/G-1. Subsea from 380 ft elevation.Download CSV →

FormationMD ftSubsea
T/Wilcox3,900-3,520
Wilcox3,900-3,520
B/Wilcox5,900-5,520
Wills Point8,700-8,320

Perforations

Perforated and open-hole intervals.

FromToType
7,9788,384Perforated
9,2509,419Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62576412.25350 S
76,7988.75265 S
4.59,5796.125440 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 22, 1994Sep 19, 1994Yes
00Oct 14, 1994——
00Sep 20, 1994Jul 13, 1994Yes
00Jul 22, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533162, documented in the API reference.