TEXAS · WELLS · ZAPATA COUNTY · API 42-505-33223 · DISTRICT 04

Vela J. M. #11

Plugged

Zapata County · Laredo S. (Wilcox 5500) field  · Vertical

Vela J. M. #11 (API 42-505-33223) is a plugged well in Zapata County, plugged September 16, 2004, last operated by Chevron U. S. A. Inc..

The RRC has issued 2 drilling permits (amended once) between 1994 and 2001, permitted to 10,000 ft.

Completion filings report 2 formation tops, including Wilcox, Midway.

Its 2 leases have reported 324 barrels of oil and 1.23M mcf of gas since November 1994, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Chevron U. S. A. Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Permits on file
9,293
Phone
(866) 212-1212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChevron U. S. A. Inc.
Production reportsChevron U. S. A. Inc.through Aug 2004
Latest permitChevron U. S. A. Inc.Dec 13, 2001
10,000
total depth, ft
3
permits on file
Dec 13, 2001
last permit issued
Dec 18, 2001
completed
324
cumulative oil, bbl
1.23M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1994 THROUGH Aug 2004

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 18, 2001
Shut in
—
Plugged
Sep 16, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vela, J. M. G-4-186962Laredo, S. (Wilcox 5500)Chevron U. S. A. Inc.105.98KDec 2001 – Aug 2004
Vela, J. M. G-4-152395Bashara-Hereford (7300)Chevron U. S. A. Inc.13241.22MNov 1994 – Dec 2001

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Nov 1994 → Aug 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
516098-99RecompletionChevron U. S. A. Inc.Dec 13, 2001Dec 13, 2001Dec 18, 20018,100
426105-98DrillChevron U. S. A. Inc.Oct 10, 1994Jul 21, 1994Oct 22, 199410,000
426105-99DrillChevron U. S. A. Inc.Jul 21, 1994Jul 21, 1994—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 18, 2001Vela J. M. G-4-186962Laredo S. (Wilcox 5500)Chevron U. S. A. Inc.Plugged—
Nov 16, 1994Vela J. M. G-4-152395Bashara-Hereford (7300)Chevron U. S. A. Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 390 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxMIDDLE WILCOX6,250-5,860
WilcoxLOWER WILCOX7,820-7,430
Midway8,400-8,010

Perforations

Perforated and open-hole intervals.

FromToType
6,5266,540Perforated
6,5436,547Perforated
8,1488,154Perforated
8,1748,188Perforated
8,2548,264Perforated
8,2848,288Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62599012.25350 S
76,4328.75250 S
2.8759,5696.125550 S
2.8759,5697550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 19, 2002Feb 5, 2002Yes
00Feb 25, 2002——
00Feb 27, 1995Nov 30, 1994Yes
00Jan 27, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533223, documented in the API reference.