TEXAS · WELLS · ZAPATA COUNTY · PEREZ, F.R. LEASE · API 42-505-33377 · DISTRICT 04
Perez F.R. #6
Zapata County · Bob West North (L-1 L-2 L-3) field · Temp Abandoned · Directional
Perez F.R. #6 (API 42-505-33377) is a well in Zapata County operated by Beehive Operating LLC, completed February 3, 1996 and listed as temp abandoned on the RRC schedule, shut in October 1, 2021.
The RRC has issued one drilling permit, issued December 18, 1995, permitted to 8,912 ft.
It was permitted by Transtexas Gas Corporation and has since transferred to Beehive Operating LLC on the wellbore schedule.
Completion filings report 4 formation tops, including L-1, Top L1, L-3, Top L3.
Its lease has reported 1.73K barrels of oil and 975K mcf of gas since February 1996, with no volume in the three years through April 2026.
Operator of record
Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.
- Based in
- Graham, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Aug 4, 2025
- Phone
- (940) 549-0131
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Beehive Operating LLC |
| Production reports | Beehive Operating, LLCthrough Sep 2021 |
| Latest permit | Transtexas Gas CorporationDec 18, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,912
- total depth, ft
- 1
- permits on file
- Dec 18, 1995
- last permit issued
- Feb 3, 1996
- completed
- 1.73K
- cumulative oil, bbl
- 975K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH Sep 2021
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 3, 1996
- Shut in
- Oct 1, 2021
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Perez, F.R. G-4-160512 | Bob West, North (L-1,L-2,L-3) | Beehive Operating, LLC | 1 | 1.73K | 975K | Feb 1996 – Sep 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Transtexas Gas CorporationFeb 1996 → Oct 2001
- 2El Paso Production Oil & Gas Co.Nov 2001 → Jun 2006
- 3El Paso E & P Company, L. P.Nov 2006 → Jul 2008
- 4Crimson Exploration Oper., Inc.Oct 2008 → Jul 2009
- 5Beehive Operating, LLCJun 2017 → Sep 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 442921-99 | Drill | Transtexas Gas Corporation | Dec 18, 1995 | Dec 18, 1995 | Dec 24, 1995 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 3, 1996 | Perez F.R. G-4-160512 | Bob West North (L-1 L-2 L-3) | Beehive Operating LLC | Temp Abandoned · shut in Oct 1, 2021 | 8,912 |
Formation tops
As filed on W-2/G-1. Subsea from 319 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| L-1 | 7,810 | -7,491 |
| Top L1 | 7,810 | -7,491 |
| L-3 | 8,210 | -7,891 |
| Top L3 | 8,210 | -7,891 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,216 | 8,288 | Perforated |
| 8,340 | 8,626 | Perforated |
| 8,340 | 8,628 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 747 | 12.25 | 335 S |
| 7 | 7,681 | 8.75 | 330 S |
| 2.875 | 8,892 | 6.125 | 370 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 18, 1997 | Nov 14, 1996 | — |
| 00 | Dec 3, 1996 | Feb 20, 1996 | Yes |
| 00 | Nov 14, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-33377 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-33377 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50533377, documented in the API reference.