TEXAS · WELLS · ZAPATA COUNTY · PALMYRA LEASE · API 42-505-33391 · DISTRICT 04

Palmyra #5

Y

Zapata County · Bob West North (L-1 L-2 L-3) field · Producing  · Directional

Palmyra #5 (API 42-505-33391) is a well in Zapata County operated by Beehive Operating LLC, completed May 17, 1996 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued January 26, 1996, permitted to 12,886 ft.

It was permitted by Transtexas Gas Corporation and has since transferred to Beehive Operating LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Queen City, Carrizo, L1 Sand, L1 Sd.

No lease production has been reported under this well’s leases.

Operator of record

Beehive Operating LLC

Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.

Based in
Graham, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 4, 2025
Phone
(940) 549-0131

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBeehive Operating LLC
Production reportsBeehive Operating, LLCthrough Apr 2026
Latest permitTranstexas Gas CorporationJan 26, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,886
total depth, ft
2
permits on file
Jan 26, 1996
last permit issued
May 17, 1996
completed
0
cumulative oil, bbl
18.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 17, 1996
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Palmyra G-4-161329Bob West, North (L2, L3)Beehive Operating, LLC1018.9MMay 1996 – Jul 2026

Gas, mcf lease total

Last 12 months 80,457 · prior 12 95,097(-15%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationMay 1996 → Oct 2001
  2. 2El Paso Production Oil & Gas Co.Nov 2001 → Jul 2006
  3. 3El Paso E & P Company, L. P.Aug 2006 → Feb 2008
  4. 4Smith Production Inc.Mar 2008 → Apr 2008
  5. 5Crimson Exploration Oper., Inc.May 2008 → Jan 2017
  6. 6Beehive Operating, LLCFeb 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
444170-98DrillTranstexas Gas CorporationJul 30, 1996Jan 26, 1996—13,500
444170-99DrillTranstexas Gas CorporationJan 26, 1996Jan 26, 1996Mar 23, 199613,500

Completions

CompletedLeaseFieldOperatorStatusDepth
May 17, 1996Palmyra G-4-161329Bob West North (L-1 L-2 L-3)Beehive Operating LLCProducing12,886

Formation tops

As filed on W-2/G-1. Subsea from 308 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City2,080-1,772
Carrizo5,530-5,222
L1 Sand8,570-8,262
L1 SD8,570-8,262

Perforations

Perforated and open-hole intervals.

FromToType
8,5708,914Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62579612.25348 S
78,3008.751,348 S
4.59,2006.125150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 23, 1999Jul 28, 1999—
00Feb 26, 1997Jul 1, 1996Yes
00Feb 5, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533391, documented in the API reference.