TEXAS · WELLS · ZAPATA COUNTY · LANIER-RATHMELL-ALEXANDER G U LEASE · API 42-505-33444 · DISTRICT 04

Lanier-Rathmell-Alexander G U #1

Shut in

Zapata County · Exsun (Lobo Cons.) field · Temp Abandoned  · Directional

Lanier-Rathmell-Alexander G U #1 (API 42-505-33444) is a well in Zapata County operated by Hilcorp Energy Company, completed July 12, 1996 and listed as temp abandoned on the RRC schedule, shut in July 1, 2018.

The RRC has issued one drilling permit, issued June 5, 1996, permitted to 11,114 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Lobo Unconformity, Midway, Cretaceous.

Its lease has reported 571 barrels of oil and 927K mcf of gas since July 1996, with no volume in the three years through April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Mar 2026
Latest permitChevron U. S. A. Inc.Jun 5, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,114
total depth, ft
1
permits on file
Jun 5, 1996
last permit issued
Jul 12, 1996
completed
571
cumulative oil, bbl
927K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 12, 1996
Shut in
Jul 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lanier-Rathmell-Alexander G U G-4-160320Exsun (Lobo Cons.)Hilcorp Energy Company1571927KJul 1996 – Mar 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jul 1996 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Jul 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
448918-99DrillChevron U. S. A. Inc.Jun 5, 1996Jun 5, 1996Jun 9, 199612,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 12, 1996Lanier-Rathmell-Alexander G U G-4-160320Exsun (Lobo Cons.)Hilcorp Energy CompanyTemp Abandoned · shut in Jul 1, 201811,114

Formation tops

As filed on W-2/G-1. Subsea from 488 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo Unconformity8,260-7,772
Midway10,646-10,158
Cretaceous10,996-10,508

Perforations

Perforated and open-hole intervals.

FromToType
10,39410,398Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,00012.25378 S
76,5428.75325 S
4.511,0586.125505 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 19, 1996Jul 30, 1996Yes
00Nov 4, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533444, documented in the API reference.