TEXAS · WELLS · ZAPATA COUNTY · API 42-505-33469 · DISTRICT 04
Gonzalez-Gil a GU #1
Zapata County · Las Lomas (Wilcox 7800) field · Producing · Vertical
Gonzalez-Gil A GU #1 (API 42-505-33469) is a well in Zapata County operated by Clr Secondary Recovery LLC, completed January 25, 2000 and listed as producing on the RRC schedule, shut in November 1, 2022.
The RRC has issued one drilling permit (amended twice), issued August 30, 1996, permitted to 8,250 ft.
It was permitted by Enron Oil & Gas Company and has since transferred to Clr Secondary Recovery LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Wilcox, Top Lwr Wx.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.
- Based in
- Wichita Falls, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jul 12, 2023
- Phone
- (903) 929-8227
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CLR Secondary Recovery LLC |
| Production reports | Sandel Operating Companythrough Oct 2022 |
| Latest permit | Enron Oil & Gas CompanyAug 30, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,250
- total depth, ft
- 3
- permits on file
- Aug 30, 1996
- last permit issued
- Jan 25, 2000
- completed
- 0
- cumulative oil, bbl
- 3.58M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 25, 2000
- Shut in
- Nov 1, 2022
- Plugged
- —
Operator's P-5 on the schedule: Delinquent (D)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gonzalez-Gil a GU G-4-161389 | Las Lomas (Wilcox 7800) | CLR Secondary Recovery, LLC | 1 | 0 | 3.58M | Oct 1996 – Jul 2026 |
| Gonzalez-Gil a GU G-4-161509 | Wildcat | EOG Resources, Inc. | 1 | 0 | 0 | Oct 1996 – Jul 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enron Oil & Gas CompanyOct 1996 → Sep 1999
- 2EOG Resources, Inc.Oct 1999 → Jun 2011
- 3Sandel Operating CompanyJul 2011 → Oct 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 452142-97 | Drill | Enron Oil & Gas Company | Nov 1, 1996 | Aug 30, 1996 | Sep 14, 1996 | 9,250 |
| 452142-98 | Drill | Enron Oil & Gas Company | Sep 20, 1996 | Aug 30, 1996 | — | 9,250 |
| 452142-99 | Drill | Enron Oil & Gas Company | Aug 30, 1996 | Aug 30, 1996 | — | 9,250 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 25, 2000 | Gonzalez-Gil a GU G-4-161389 | Las Lomas (Wilcox 7800) | CLR Secondary Recovery LLC | Producing · shut in Nov 1, 2022 | 8,250 |
| Oct 9, 1996 | Gonzalez-Gil a GU G-4-161509 | Wildcat | EOG Resources Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 455 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,330 | 7,340 | Perforated |
| 7,500 | 7,506 | Perforated |
| 7,590 | 7,608 | Perforated |
| 7,590 | 7,674 | Perforated |
| 7,651 | 7,674 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,006 | 12.25 | 340 S |
| 7 | 6,954 | 8.75 | 865 S |
| 2.875 | 8,239 | 6.25 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 23, 2000 | Feb 18, 2000 | — |
| 00 | Mar 10, 1997 | Nov 20, 1996 | — |
| 00 | Mar 10, 1997 | Oct 30, 1996 | Yes |
| 00 | Feb 12, 1997 | — | — |
| 00 | Feb 7, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-33469 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-33469 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50533469, documented in the API reference.