TEXAS · WELLS · ZAPATA COUNTY · RAMIREZ, R. LEASE · API 42-505-33528 · DISTRICT 04

Ramirez R. #1

Y

Zapata County · Cisco-Benavides (Lobo Cons.) field · Producing  · Directional

Ramirez R. #1 (API 42-505-33528) is a well in Zapata County operated by Hilcorp Energy Company, completed November 10, 1997 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1996 and 1997, permitted to 9,502 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including Lobo Unconformity.

Its lease has reported 879 barrels of oil and 725K mcf of gas since November 1997, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitChevron U. S. A. Inc.Sep 8, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,502
total depth, ft
2
permits on file
Sep 8, 1997
last permit issued
Nov 10, 1997
completed
879
cumulative oil, bbl
725K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1997 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 10, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ramirez, R. G-4-165895Cisco-Benavides (Lobo Cons.)Hilcorp Energy Company1879725KNov 1997 – Apr 2026

Gas, mcf lease total

Last 12 months 8,456 · prior 12 7,550(+12%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Nov 1997 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
467244-99ReenterChevron U. S. A. Inc.Sep 4, 1997Sep 8, 1997Oct 25, 199710,300
456229-99DrillChevron U. S. A. Inc.Dec 12, 1996Dec 12, 1996Dec 31, 199610,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 10, 1997Ramirez R. G-4-165895Cisco-Benavides (Lobo Cons.)Hilcorp Energy CompanyProducing9,502

Formation tops

As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo Unconformity7,470-7,110

Perforations

Perforated and open-hole intervals.

FromToType
7,5267,538Perforated
8,4628,478Perforated
9,0179,019Perforated
9,2969,305Perforated
9,3389,347Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,08512.25415 S
76,1798.75250 S
2.8759,4786.125670 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 22, 1998Dec 29, 1997Yes
00Jan 14, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533528, documented in the API reference.