TEXAS · WELLS · ZAPATA COUNTY · GARZA, A. LEASE · API 42-505-33633 · DISTRICT 04

Garza A. #6

Y

Zapata County · Charco (9200) field · Producing  · Vertical

Garza A. #6 (API 42-505-33633) is a well in Zapata County operated by Hilcorp Energy Company, completed August 6, 1997 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 20, 1997, permitted to 10,200 ft.

It was permitted by Houston Exploration Company, The and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its lease has reported 1.73K barrels of oil and 5.14M mcf of gas since August 1997, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Houston Exploration Company, The; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHouston Exploration Company, TheJun 20, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,200
total depth, ft
1
permits on file
Jun 20, 1997
last permit issued
Aug 6, 1997
completed
1.73K
cumulative oil, bbl
5.14M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1997 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 6, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garza, A. G-4-164457Charco (9200)Hilcorp Energy Company11.73K5.14MAug 1997 – Apr 2026

Gas, mcf lease total

Last 12 months 35,110 · prior 12 39,647(-11%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Houston Exploration Company, TheAug 1997 → Jun 2007
  2. 2Forest Oil CorporationJul 2007 → Dec 2012
  3. 3Hilcorp Energy CompanyJan 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
463987-99DrillHouston Exploration Company, TheJun 19, 1997Jun 20, 1997Jun 30, 199710,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 6, 1997Garza A. G-4-164457Charco (9200)Hilcorp Energy CompanyProducing10,200

Perforations

Perforated and open-hole intervals.

FromToType
9,2429,270Perforated
9,2849,286Perforated
9,3989,412Perforated
9,4219,424Perforated
9,4679,492Perforated
9,5029,510Perforated
9,5389,548Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1456——
9.62575012.25305 S
78,3008.75395 S
4.510,2006.25200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 6, 1997Sep 19, 1997Yes
00Sep 30, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533633, documented in the API reference.