WELL · 42-505-33697 · DISTRICT 4
U.S.A. Gas Unit 2 #1ST
Zapata County · Bob West North (L-1 L-2 L-3) field · Directional · Sidetrack
U.S.A. Gas Unit 2 #1ST (API 42-505-33697) is a plugged well in Zapata County, plugged June 22, 2020, last operated by Transtexas Gas Corporation.
The RRC has issued 3 drilling permits between 1997 and 2000, permitted to 14,000 ft.
Completion filings report 5 formation tops, including Lz4 (W-16), Lz4, L-1, L-2.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 2, 2004
- Permits on file
- 925
- Phone
- (214) 692-9211
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Transtexas Gas Corporation |
| Production reports | Crimson Exploration Oper., Inc.through Jul 2015 |
| Latest permit | Transtexas Gas CorporationDec 13, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 3
- permits on file
- Dec 13, 2000
- last permit issued
- Jul 10, 1998
- completed
- 0
- cumulative oil, bbl
- 4.18M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1998 THROUGH Feb 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 10, 1998
- Shut in
- —
- Plugged
- Jun 22, 2020
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| U.S.A. Gas Unit 2 G-4-180337 | Bob West, North (LZ-5) | Beehive Operating, LLC | 1 | 0 | 3.74M | Dec 2000 – Feb 2021 |
| U.S.A. Gas Unit 2 G-4-168961 | Bob West, North (L-1,L-2,L-3) | Transtexas Gas Corporation | 1 | 0 | 438K | Jun 1998 – Mar 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Transtexas Gas CorporationJul 1998 → Oct 2001
- 2EL Paso Production Oil & Gas Co.Nov 2001 → Jul 2006
- 3EL Paso E & P Company, L. P.Aug 2006 → Jul 2008
- 4Crimson Exploration Oper., Inc.Aug 2008 → Jul 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 502638-99 | Recompletion · sidetrack | Transtexas Gas Corporation | Dec 5, 2000 | Dec 13, 2000 | Dec 17, 2000 | 9,117 |
| 477048-99 | Recompletion | Transtexas Gas Corporation | Jun 11, 1998 | Jun 11, 1998 | Jun 11, 1998 | 14,000 |
| 469580-99 | Drill | Transtexas Gas Corporation | Nov 3, 1997 | Nov 3, 1997 | Feb 13, 1998 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-168961 | — | — | — | — |
| — | — G-4-180337 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 338 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| LZ4 (W-16) | 6,276 | -5,938 |
| LZ4 | 6,650 | -6,312 |
| L-1 | 7,446 | -7,108 |
| L-2 | 7,576 | -7,238 |
| L1 | 8,110 | -7,772 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,140 | 7,170 | Perforated |
| 7,304 | 7,324 | Perforated |
| 8,566 | 8,612 | Perforated |
| 8,660 | 8,706 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 494 | 17.5 | 463 S |
| 9.625 | 3,806 | 12.25 | 650 S |
| 2.875 | 9,108 | 6.125 | 437 S |
| 7 | 9,200 | 8.75 | 384 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 17, 2001 | Jan 10, 2001 | Yes |
| 00 | Jan 26, 2001 | — | — |
| 00 | Mar 22, 1999 | Jul 29, 1998 | Yes |
| 00 | Nov 19, 1998 | Jul 31, 1998 | — |
| 00 | Aug 3, 1998 | Jun 11, 1998 | Yes |
| 00 | Jul 28, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-33697 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-33697 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50533697, documented in the API reference.