TEXAS · WELLS · ZAPATA COUNTY · API 42-505-33736 · DISTRICT 04

Martinez Adela M. et Al #1

Y

Zapata County · Big Mac (6470) field · SWR-10-Well  · Vertical

Martinez Adela M. ET AL #1 (API 42-505-33736) is a well in Zapata County operated by Hilcorp Energy Company, completed April 22, 2000 and listed as swr-10-well on the RRC schedule.

The RRC has issued 2 drilling permits between 1997 and 2000, permitted to 9,155 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including Lobo Unconformity.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitChevron U. S. A. Inc.Jan 14, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,155
total depth, ft
2
permits on file
Jan 14, 2000
last permit issued
Apr 22, 2000
completed
0
cumulative oil, bbl
4.48M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 22, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Martinez, Adela M. et Al G-4-168553Francisco (Lobo 8200)Hilcorp Energy Company104.38MMar 1998 – Jul 2026
Martinez, Adela M. et Al G-4-176484Big Mac (6470)Hilcorp Energy Company10102KJan 2000 – Jul 2026

Gas, mcf lease total

Last 12 months 48,784 · prior 12 58,019(-16%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Mar 1998 → Oct 2014
  2. 2Hilcorp Energy CompanyNov 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
491107-99RecompletionChevron U. S. A. Inc.Jan 14, 2000Jan 14, 2000Jan 21, 20009,155
471611-99DrillChevron U. S. A. Inc.Dec 23, 1997Dec 23, 1997Feb 12, 199810,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 22, 2000Martinez Adela M. et Al G-4-176484Big Mac (6470)Hilcorp Energy CompanySWR-10-Well · shut in Oct 1, 20009,155
Apr 22, 2000Martinez Adela M. et Al G-4-168553Cisco-Benavides (Lobo Cons.)Hilcorp Energy CompanyProducing9,155

Formation tops

As filed on W-2/G-1. Subsea from 390 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo Unconformity7,690-7,300

Perforations

Perforated and open-hole intervals.

FromToType
6,8156,820Perforated
7,7217,726Perforated
7,9597,964Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,10712.25420 S
76,4438.75525 S
4.59,1556.125405 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 28, 2000May 15, 2000—
00May 2, 2000Mar 2, 2000—
00Apr 17, 2000——
00Jul 16, 1998May 1, 1998Yes
00Jun 30, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533736, documented in the API reference.