TEXAS · WELLS · ZAPATA COUNTY · RAMIREZ, L. O. A LEASE · API 42-505-33789 · DISTRICT 04

Ramirez L. O. A #9

Y

Zapata County · Roleta (7483) field · Temp Abandoned  · Directional

Ramirez L. O. A #9 (API 42-505-33789) is a well in Zapata County operated by Hilcorp Energy Company, completed August 13, 1998 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued April 21, 1998, permitted to 12,600 ft.

It was permitted by Conoco Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report one formation top, including Roleta (7483).

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitConoco Inc.Apr 21, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,600
total depth, ft
3
permits on file
Apr 21, 1998
last permit issued
Aug 13, 1998
completed
0
cumulative oil, bbl
3.89M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1998 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 13, 1998
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ramirez, L. O. A G-4-170414Roleta (7483)Hilcorp Energy Company103.89MAug 1998 – Jul 2026

Gas, mcf lease total

Last 12 months 63,149 · prior 12 59,678(+6%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Aug 1998 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Dec 2015
  3. 3Hilcorp Energy CompanyJan 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
475242-97DrillConoco Inc.Oct 5, 1998Apr 21, 1998Jun 15, 199812,200
475242-98DrillConoco Inc.May 18, 1998Apr 21, 1998—13,500
475242-99DrillConoco Inc.Apr 13, 1998Apr 21, 1998—12,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 13, 1998Ramirez L. O. A G-4-170414Roleta (7483)Hilcorp Energy CompanyTemp Abandoned12,600

Formation tops

As filed on W-2/G-1. Subsea from 316 ft elevation.Download CSV →

FormationMD ftSubsea
Roleta (7483)10,834-10,518

Perforations

Perforated and open-hole intervals.

FromToType
10,84010,854Perforated
11,09811,104Perforated
11,11011,124Perforated
11,13011,134Perforated
11,14411,156Perforated
11,16411,178Perforated
11,19611,200Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37562417.5530 S
9.6254,28512.25540 S
78,7728.75870 S
4.512,6006.25385 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 23, 1998Oct 5, 1998Yes
00Nov 19, 1998Sep 16, 1998—
00Oct 27, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533789, documented in the API reference.