TEXAS · WELLS · ZAPATA COUNTY · HAYNES LEASE · API 42-505-33872 · DISTRICT 04

Haynes #17

Y

Zapata County · Haynes (Hinnant Cons.) field · Producing  · Vertical

Haynes #17 (API 42-505-33872) is a well in Zapata County operated by Hilcorp Energy Company, completed April 1, 1999 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued November 10, 1998, permitted to 14,215 ft.

It was permitted by Union Pacific Resources Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including H1, Wilcox.

Its lease has reported 177 barrels of oil and 10.1M mcf of gas since April 1999, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitUnion Pacific Resources CompanyNov 10, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,215
total depth, ft
1
permits on file
Nov 10, 1998
last permit issued
Apr 1, 1999
completed
177
cumulative oil, bbl
10.1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 1, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haynes G-4-172710Haynes (Hinnant Cons.)Hilcorp Energy Company117710.1MApr 1999 – Apr 2026

Gas, mcf lease total

Last 12 months 154,773 · prior 12 160,196(-3%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyApr 1999 → Apr 1999
  2. 2Pennzenergy Exp. & Prod., L.L.C.May 1999 → Mar 2000
  3. 3Devon Energy Production Co, L.P.Apr 2000 → Mar 2005
  4. 4Chesapeake Operating, Inc.Apr 2005 → Aug 2014
  5. 5Hilcorp Energy CompanySep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
480745-99DrillUnion Pacific Resources CompanyNov 10, 1998Nov 10, 1998Dec 15, 199815,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 1, 1999Haynes G-4-172710Haynes (Hinnant Cons.)Hilcorp Energy CompanyProducing14,215

Formation tops

As filed on W-2/G-1. Subsea from 424 ft elevation.Download CSV →

FormationMD ftSubsea
H19,650-9,226
Wilcox10,522-10,098

Perforations

Perforated and open-hole intervals.

FromToType
12,78812,842Perforated
12,89812,948Perforated
13,07613,106Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,21414.75715 S
4.58,6616.75845 S
7.6259,0159.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 18, 1999Apr 21, 1999Yes
00May 7, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533872, documented in the API reference.