TEXAS · WELLS · ZAPATA COUNTY · API 42-505-33893 · DISTRICT 04

Ramon Belia et Al #3

Y

Zapata County · Cisco-Benavides (Lobo Cons.) field · Producing  · Vertical

Ramon Belia ET AL #3 (API 42-505-33893) is a well in Zapata County operated by Hilcorp Energy Company, completed November 7, 1999 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued January 19, 1999, permitted to 8,824 ft.

It was permitted by Chevron U. S. A. Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Lobo Uncomformity, Lobo Unconformity.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Chevron U. S. A. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitChevron U. S. A. Inc.Jan 19, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,824
total depth, ft
3
permits on file
Jan 19, 1999
last permit issued
Nov 7, 1999
completed
0
cumulative oil, bbl
1.2M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 7, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ramon, Belia et Al G-4-173781Francisco (Lobo 8200)Hilcorp Energy Company101.14MMar 1999 – Jul 2026
Ramon, Belia et Al G-4-173794Big Mac (6470)Hilcorp Energy Company1053.8KJun 1999 – Jul 2026

Gas, mcf lease total

Last 12 months 8,176 · prior 12 10,861(-25%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Apr 1999 → Aug 2014
  2. 2Hilcorp Energy CompanySep 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
482114-97DrillChevron U. S. A. Inc.Jul 14, 1999Jan 19, 1999—8,825
482114-98DrillChevron U. S. A. Inc.Jun 21, 1999Jan 19, 1999May 24, 19997,865
482114-99DrillChevron U. S. A. Inc.Jan 19, 1999Jan 19, 1999—10,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 7, 1999Ramon Belia et Al G-4-173781Cisco-Benavides (Lobo Cons.)Hilcorp Energy CompanyProducing8,824
Jun 19, 1999Ramon Belia et Al G-4-173794Big Mac (6470)Hilcorp Energy CompanySWR-10-Well · shut in Oct 1, 20008,824

Formation tops

As filed on W-2/G-1. Subsea from 374 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo Uncomformity7,765-7,391
Lobo Unconformity7,765-7,391

Perforations

Perforated and open-hole intervals.

FromToType
6,2406,250Perforated
7,9267,931Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,11712.25420 S
76,8138.75335 S
2.8758,8146.125290 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 23, 1999Dec 6, 1999—
00Aug 23, 1999Jul 12, 1999Yes
00Aug 23, 1999Jun 25, 1999—
00Aug 12, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533893, documented in the API reference.