TEXAS · WELLS · ZAPATA COUNTY · API 42-505-33930 · DISTRICT 04

Alfonso #10

Y

Zapata County · Charco (9200) field · Producing  · Vertical

Alfonso #10 (API 42-505-33930) is a well in Zapata County operated by Hilcorp Energy Company, completed July 25, 1999 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 19, 1999, permitted to 10,310 ft.

It was permitted by Houston Exploration Company, The and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its 2 leases have reported 12.8K barrels of oil and 3.48M mcf of gas since July 1999, last reporting volume in April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hilcorp Energy Company

Permitted by Houston Exploration Company, The; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitHouston Exploration Company, TheApr 19, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,310
total depth, ft
1
permits on file
Apr 19, 1999
last permit issued
Jul 25, 1999
completed
12.8K
cumulative oil, bbl
3.48M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 25, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Alfonso G-4-173999Charco (9200)Hilcorp Energy Company112.8K3.48MJul 1999 – Apr 2026
Alfonso G-4-173998Charco (9900)Hilcorp Energy Company100Jul 1999 – —

Gas, mcf lease total

Last 12 months 12,467 · prior 12 16,306(-24%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Houston Exploration Company, TheJul 1999 → Jun 2007
  2. 2Forest Oil CorporationJul 2007 → Dec 2012
  3. 3Hilcorp Energy CompanyJan 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
483912-99DrillHouston Exploration Company, TheApr 16, 1999Apr 19, 1999Jun 7, 199911,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 25, 1999Alfonso G-4-173999Charco (9200)Hilcorp Energy CompanyProducing10,310
Jul 13, 1999Alfonso G-4-173998Charco (9900)Hilcorp Energy CompanySWR-10-Well · shut in Oct 1, 200010,310

Perforations

Perforated and open-hole intervals.

FromToType
9,3379,483Perforated
10,00210,116Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
166117.7585 S
10.7576014.75540 S
78,4508.75445 S
4.510,3006.25250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 17, 1999Aug 20, 1999—
00Sep 16, 1999Aug 20, 1999Yes
00Sep 3, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50533930, documented in the API reference.