TEXAS · WELLS · ZAPATA COUNTY · API 42-505-34050 · DISTRICT 04

Jennings #1

Plugged

Zapata County · Martinez (5TH Hinnant) field  · Vertical

Jennings #1 (API 42-505-34050) is a plugged well in Zapata County, plugged November 12, 2012, last operated by Xto Energy Inc..

The RRC has issued 2 drilling permits (amended once) between 1999 and 2003, permitted to 13,000 ft.

It was permitted by Dominion Oklahoma Texas E&P, Inc and has since transferred to Xto Energy Inc. on the wellbore schedule.

Operator of record

XTO Energy Inc.

Permitted by Dominion Oklahoma Texas E&P, Inc; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Dec 2011
Latest permitDominion Oklahoma Texas E&P, IncMar 3, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
3
permits on file
Mar 3, 2003
last permit issued
Feb 10, 2006
completed
0
cumulative oil, bbl
3.99M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2000 THROUGH Nov 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 10, 2006
Shut in
—
Plugged
Nov 12, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jennings G-4-194535Martinez (5TH Hinnant)XTO Energy Inc.102.98MMar 2003 – Nov 2012
Jennings G-4-176393Martinez (Hinnant 3RD.)Dominion Oklahoma Texas E&P, Inc101.01MFeb 2000 – Mar 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dreyfus, Louis Natural Gas CorpFeb 2000 → Nov 2001
  2. 2Dominion Oklahoma Texas E&P, IncDec 2001 → Jul 2007
  3. 3XTO Energy Inc.Aug 2007 → Dec 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
529052-99RecompletionDominion Oklahoma Texas E&P, IncMar 3, 2003Mar 3, 2003Mar 7, 200312,537
490402-98DrillDreyfus, Louis Natural Gas CorpMar 1, 2000Dec 15, 1999Dec 25, 199913,000
490402-99DrillDreyfus, Louis Natural Gas CorpDec 15, 1999Dec 15, 1999—13,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 10, 2006Jennings G-4-194535Martinez (5TH Hinnant)XTO Energy Inc.Plugged—
Feb 25, 2000Jennings G-4-176393Martinez (Hinnant 3RD.)Dominion Oklahoma Texas E&P IncPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
11,23811,252Perforated
12,25412,290Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,00017.5919 S
9.6258,61512.25683 S
5.512,5378.5920 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 6, 2006Feb 23, 2006—
00Feb 17, 2005Oct 18, 2004—
00Jun 11, 2003May 6, 2003Yes
00May 30, 2003——
00Jun 12, 2001Apr 6, 2001—
00Sep 13, 2000Jul 20, 2000—
00Apr 27, 2000Mar 20, 2000Yes
00Apr 10, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534050, documented in the API reference.