TEXAS · WELLS · ZAPATA COUNTY · HAYNES LEASE · API 42-505-34069 · DISTRICT 04
Haynes #20
Zapata County · Wildcat field · Temp Abandoned · Directional
Haynes #20 (API 42-505-34069) is a well in Zapata County operated by Hilcorp Energy Company, completed February 13, 2000 and listed as temp abandoned on the RRC schedule, shut in January 1, 1999.
The RRC has issued one drilling permit (amended twice), issued January 20, 2000, permitted to 1,234 ft.
It was permitted by Union Pacific Resources Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Union Pacific Resources Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,458
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | none |
| Latest permit | Union Pacific Resources CompanyJan 20, 2000 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,234
- total depth, ft
- 3
- permits on file
- Jan 20, 2000
- last permit issued
- Feb 13, 2000
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2000 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 13, 2000
- Shut in
- Jan 1, 1999
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Haynes G-4-178029 | Wildcat | Hilcorp Energy Company | 1 | 0 | 0 | Feb 2000 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 491231-97 | Drill | Union Pacific Resources Company | Jun 8, 2000 | Jan 20, 2000 | Feb 8, 2000 | 12,000 |
| 491231-98 | Drill | Union Pacific Resources Company | Jan 27, 2000 | Jan 20, 2000 | — | 14,000 |
| 491231-99 | Drill | Union Pacific Resources Company | Jan 20, 2000 | Jan 20, 2000 | — | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 13, 2000 | Haynes G-4-178029 | Wildcat | Hilcorp Energy Company | Temp Abandoned · shut in Jan 1, 1999 | 1,234 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,234 | 14.75 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 22, 2000 | Mar 13, 2000 | — |
| 00 | Aug 10, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-505-34069 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-505-34069 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/50534069, documented in the API reference.