TEXAS · WELLS · ZAPATA COUNTY · SLATOR RANCH "A" LEASE · API 42-505-34100 · DISTRICT 04

Slator Ranch A #4

Y

Zapata County · Zwebb (10350) field · Producing  · Vertical

Slator Ranch A #4 (API 42-505-34100) is a well in Zapata County operated by Mountain V Texas LLC, completed April 13, 2000 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits in 2000, permitted to 10,500 ft.

It was permitted by Eog Resources, Inc. and has since transferred to Mountain V Texas LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Queen City, Wilcox, Est Top Lwr Wilcox (Faulted, Out).

Its lease has reported 6.98K barrels of oil and 738K mcf of gas since April 2000, last reporting volume in April 2026.

Operator of record

Mountain V Texas LLC

Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.

Based in
Buckhannon, WV
P-5 status
Active (A)
P-5 last filed
Sep 11, 2025
Phone
(304) 842-6320

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMountain V Texas LLC
Production reportsMountain V Texas, LLCthrough Apr 2026
Latest permitEOG Resources, Inc.Jun 14, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Jun 14, 2000
last permit issued
Apr 13, 2000
completed
6.98K
cumulative oil, bbl
738K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2000 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 13, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slator Ranch "A" G-4-176950Zwebb (10350)Mountain V Texas, LLC16.98K738KApr 2000 – Apr 2026

Gas, mcf lease total

Last 12 months 11,352 · prior 12 10,905(+4%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Apr 2000 → Aug 2016
  2. 2Smith Production Inc.Sep 2016 → Mar 2026
  3. 3Mountain V Texas, LLCApr 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
496158-99RecompletionEOG Resources, Inc.Jun 14, 2000Jun 14, 2000—10,500
492999-99DrillEOG Resources, Inc.Mar 13, 2000Mar 13, 2000Mar 27, 200011,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 13, 2000Slator Ranch A G-4-176950Zwebb (10350)Mountain V Texas LLCProducing10,500

Formation tops

As filed on W-2/G-1. Subsea from 592 ft elevation.Download CSV →

FormationMD ftSubsea
Queen CityTOP OF QUEEN CITY3,933-3,341
WilcoxTOP OF WILCOX6,755-6,163
Est Top LWR Wilcox (Faulted8,295-7,703
Out)——

Perforations

Perforated and open-hole intervals.

FromToType
9,7769,796Perforated
9,8369,858Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,02312.25355 S
78,6998.75481 S
4.510,4856.125376 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 9, 2000May 3, 2000Yes
00May 31, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534100, documented in the API reference.