TEXAS · WELLS · ZAPATA COUNTY · BMT-MARTIN A LEASE · API 42-505-34106 · DISTRICT 04

BMT-Martin A #8

Y

Zapata County · La Perla (Lobo Cons.) field · Producing  · Vertical

Bmt-Martin A #8 (API 42-505-34106) is a well in Zapata County operated by Hilcorp Energy Company, completed June 28, 2000 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 31, 2000, permitted to 10,800 ft.

It was permitted by Conoco Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Wills Point.

Its lease has reported 800K mcf of gas since June 2000, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitConoco Inc.Mar 31, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,800
total depth, ft
1
permits on file
Mar 31, 2000
last permit issued
Jun 28, 2000
completed
0
cumulative oil, bbl
800K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2000 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 28, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
BMT-Martin A G-4-177875La Perla (Lobo Cons.)Hilcorp Energy Company10800KJun 2000 – Apr 2026

Gas, mcf lease total

Last 12 months 2,917 · prior 12 2,597(+12%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Jun 2000 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Dec 2015
  3. 3Hilcorp Energy CompanyJan 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
493451-99DrillConoco Inc.Mar 24, 2000Mar 31, 2000May 29, 200011,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 28, 2000BMT-Martin A G-4-177875La Perla (Lobo Cons.)Hilcorp Energy CompanyProducing10,800

Formation tops

As filed on W-2/G-1. Subsea from 499 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxBASE OF LOWER WILCOX9,688-9,189
Wills Point10,577-10,078

Perforations

Perforated and open-hole intervals.

FromToType
9,8349,876Perforated
10,11410,128Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62553312.25217 S
77,7668.75648 S
4.510,7926.25292 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 19, 2000Jul 27, 2000Yes
00Aug 3, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534106, documented in the API reference.