TEXAS · WELLS · ZAPATA COUNTY · LEONARDO LEASE · API 42-505-34254 · DISTRICT 04

Leonardo #27

Shut in

Zapata County · Charco (9200) field · Temp Abandoned  · Vertical

Fields on the latest permit · any of 3
Charco (9200) · Charco (9400) · Charco (9900)
Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.

Leonardo #27 (API 42-505-34254) is a well in Zapata County operated by Hilcorp Energy Company, completed February 9, 2001 and listed as temp abandoned on the RRC schedule, shut in December 1, 2004.

The RRC has issued one drilling permit, issued December 7, 2000, permitted to 10,158 ft.

It was permitted by Houston Exploration Company, The and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Its lease has reported 416 barrels of oil and 197K mcf of gas since February 2001, with no volume in the three years through April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Houston Exploration Company, The; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2007
Latest permitHouston Exploration Company, TheDec 7, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,158
total depth, ft
1
permits on file
Dec 7, 2000
last permit issued
Feb 9, 2001
completed
416
cumulative oil, bbl
197K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2001 THROUGH Apr 2007

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 9, 2001
Shut in
Dec 1, 2004
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Leonardo G-4-181532Charco (9200)Hilcorp Energy Company1416197KFeb 2001 – Apr 2007

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Houston Exploration Company, TheFeb 2001 → Apr 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
502716-99DrillHouston Exploration Company, TheDec 6, 2000Dec 7, 2000Dec 19, 200011,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 9, 2001Leonardo G-4-181532Charco (9200)Hilcorp Energy CompanyTemp Abandoned · shut in Dec 1, 200410,158

Perforations

Perforated and open-hole intervals.

FromToType
9,0529,066Perforated
9,2119,216Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
165617.7585 S
10.7576214.75550 S
7.6254,3308.75200 S
5.58,3006.5450 S
2.87510,0314.625175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 22, 2001Mar 16, 2001Yes
00Apr 3, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534254, documented in the API reference.