TEXAS · WELLS · ZAPATA COUNTY · FLORES, M. LEASE · API 42-505-34374 · DISTRICT 04

Flores M. #6

Shut in

Zapata County · Flores W. (Perdido) field · Temp Abandoned  · Vertical

Flores M. #6 (API 42-505-34374) is a well in Zapata County operated by Hilcorp Energy Company, completed August 26, 2001 and listed as temp abandoned on the RRC schedule, shut in June 1, 2025.

The RRC has issued one drilling permit, issued June 21, 2001, permitted to 9,710 ft.

It was permitted by Houston Exploration Company, The and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Houston Exploration Company, The; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough May 2025
Latest permitHouston Exploration Company, TheJun 21, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,710
total depth, ft
1
permits on file
Jun 21, 2001
last permit issued
Aug 26, 2001
completed
0
cumulative oil, bbl
1.17M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 26, 2001
Shut in
Jun 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Flores, M. G-4-185156Flores, W. (Perdido)Hilcorp Energy Company101.17MAug 2001 – Jul 2026

Gas, mcf lease total

Last 12 months 2 · prior 12 274(-99%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Houston Exploration Company, TheAug 2001 → Jun 2007
  2. 2Forest Oil CorporationJul 2007 → Dec 2012
  3. 3Hilcorp Energy CompanyJan 2013 → May 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
510561-99DrillHouston Exploration Company, TheJun 21, 2001Jun 21, 2001Jul 31, 20019,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 26, 2001Flores M. G-4-185156Flores W. (Perdido)Hilcorp Energy CompanyTemp Abandoned · shut in Jun 1, 20259,710

Formation tops

As filed on W-2/G-1. Subsea from 310 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa5,086-4,776
James LimeJAMES5,690-5,380
Pettit5,820-5,510
Travis Peak6,190-5,880

Perforations

Perforated and open-hole intervals.

FromToType
8,3788,720Perforated
8,4238,443Perforated
8,4648,475Perforated
8,7729,160Perforated
9,4569,486Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
166017.585 S
10.7576514.75525 S
9.6251,03412.25380 S
77,7058.75400 S
4.58,6256.25200 S
4.59,7107.8751,510 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 12, 2001Oct 9, 2001Yes
00Nov 7, 2001Oct 12, 2001Yes
00Oct 31, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534374, documented in the API reference.