TEXAS · WELLS · ZAPATA COUNTY · API 42-505-34444 · DISTRICT 04

Jennings Ranch A #6

Y

Zapata County · Charco (9900) field · SWR-10-Well  · Vertical

Jennings Ranch A #6 (API 42-505-34444) is a well in Zapata County operated by Hilcorp Energy Company, completed May 23, 2002 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued October 30, 2001, permitted to 12,500 ft.

It was permitted by Conoco Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Wilcox, Wills Point.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitConoco Inc.Oct 30, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
2
permits on file
Oct 30, 2001
last permit issued
May 23, 2002
completed
0
cumulative oil, bbl
2.09M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 23, 2002
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jennings Ranch A G-4-189994Jennings Ranch (Lobo Cons.)Hilcorp Energy Company102.09MMay 2002 – Jul 2026
Jennings Ranch A G-4-189995Charco (9900)Hilcorp Energy Company100May 2002 – Jul 2026

Gas, mcf lease total

Last 12 months 23,479 · prior 12 20,705(+13%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.May 2002 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Dec 2015
  3. 3Hilcorp Energy CompanyJan 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
514896-98DrillConoco Inc.Feb 19, 2002Oct 30, 2001Mar 13, 200213,600
514896-99DrillConoco Inc.Oct 30, 2001Oct 30, 2001—13,600

Completions

CompletedLeaseFieldOperatorStatusDepth
May 23, 2002Jennings Ranch A G-4-189995Charco (9900)Hilcorp Energy CompanySWR-10-Well · shut in May 1, 200212,500
May 23, 2002Jennings Ranch A G-4-189994Jennings Ranch (Lobo Cons.)Hilcorp Energy CompanyProducing12,500

Formation tops

As filed on W-2/G-1. Subsea from 425 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxTOP OF LOWER WILCOX11,283-10,858
Wills Point12,431-12,006

Perforations

Perforated and open-hole intervals.

FromToType
10,13610,144Perforated
11,25111,343Perforated
11,47011,635Perforated
12,15012,314Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62588212.25304 S
79,0148.75205 S
4.512,4536.25351 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 5, 2002Jul 25, 2002Yes
00Aug 23, 2002——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/50534444, documented in the API reference.